↑ Parent Menu⌂ Main Menu
← Railway Ground Hazard Risk Management
Benesch benesch
Railway Ground Hazard Risk Management · Part III · Track Substructure
Sections · click a car to open it

Chapter 2 — Track Substructure: Ballast, Subballast and Subgrade

Formerly Geo Rail Chapter 13 — Railroad Track Subgrade: Special Topics

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.
Authors: Daniel P. Colwell and Mario Ruel

Geotechnical Services Manual for Railroad Clients

A Consultant's Reference for Delivering Geotechnical Engineering Services Across North American Railroad Capital Programs

Apps for this Chapter4

Apps on dirtbert.com that support this chapter. Each one runs in a web browser on a desktop or a phone, with nothing to install. How to use the apps (I.3). Tools marked TOOLS open in the Geotechnical Analysis Suite (Benesch sign-in); the orange card below lists each one by section.

NANCY pages ask you to accept the Use and Disclaimers once in each browser. MINA is a monitoring aid and is not for operational dispatch decisions.

Analytical Tools for this Chapter7

Calculators and workbook tools from the Benesch Geotechnical Analysis Suite that support this chapter: 6 interactive calculators and 1 workbook guide. Each one is also placed inside the section it supports, in an orange tools strip.

PVRR Train Loads on SubgradeUsed in 2.2 Load Distribution — Talbot MethodCalculator ▸Guide
PVPercent Saturation — Subgrade SamplesUsed in 2.5 Subgrade Failure ModesCalculator ▸Guide
SPDynamic Cone PenetrometerUsed in 2.6 Track ModulusCalculator ▸Guide
PVCBR CorrelationsApplies to the chapter as a wholeCalculator ▸Guide
PVFrost Penetration — Stefan EquationUsed in 2.5 Subgrade Failure ModesCalculator ▸Guide
PVFrost Penetration — Berggren EquationUsed in 2.5 Subgrade Failure ModesCalculator ▸Guide
PVCookbook RailroadUsed in 2.1 Background: The Railroad Track Structureguide onlyGuide

Tools open on dirtbert.com and need the Benesch sign-in. Drafts pending Benesch final review, not for use in design.

Reference Graphics
2.0 Executive Summary

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests. Unlike highway or airfield pavement subgrades, railroad subgrades are subjected to high-frequency, high-magnitude cyclic loading from heavy-axle freight traffic (286,000 lb gross rail load is the North American standard), combined with dynamic amplification, repeated wetting and drying, freeze-thaw action, and the progressive accumulation of ballast fines over time. Subgrade failures — progressive shear failure, ballast pocket formation, pumping, differential frost heave — are among the most common and expensive maintenance problems faced by North American freight railroads.

This chapter provides the geotechnical consultant's framework for characterizing, designing, and remediating railroad track subgrades. It covers the Talbot load distribution method, stress at top of subgrade, ballast and subballast specification per AREMA Manual for Railway Engineering Chapter 1, blanket layer design, subgrade failure mode identification, track modulus, ballast fouling index, subgrade drainage, and ground-penetrating radar (GPR) as a diagnostic tool. All nine client railroads — CSXT, NSR, G&W, UPRR, BNSF, CPKC, Amtrak, and CN — have specific subgrade requirements that are integrated throughout.

Empirical Equations — Use and Limitations

The correlations below are used or referenced in this chapter. Each is a statistical fit to a particular data set, so a value from one is an estimate: it applies only within the materials and ranges stated, carries the scatter of the original data, and must be confirmed by site-specific testing or calibration before it is relied on for design.

When an equation is used, note it with the result: give the equation ID and source, state that the soil or rock is within its range of applicability, mark the value as correlated (not tested), and record the limitation that governs. The Empirical Equations & Correlations reference has every entry with its full references.

Referenced in this chapter

IS-18Shear-wave velocity from CPTVₛ
Vs = [ αvs · (qt − σv0) / Pa ]0.5   (m/s)
αvs = 10(0.55 Ic + 1.68)

Variables. Ic from IS-13

Use. Young, uncemented Holocene–Pleistocene soils.

Limitations. Underpredicts Vs in aged or cemented soils. Measure Vs directly for seismic site class.

Source. Robertson 2009 · In this chapter: 2.6 · Full entry and references

RK-10UCS from point load indexσ꜀
σc ≈ K · Is(50),   K ≈ 24 (range ~15–50)
Is(50) = F · Is;   F = (De/50)0.45

Variables. De = equivalent core diameter (mm); Is = P/De2

Use. Hard, isotropic rock; quick strength index in field.

Limitations. K varies widely with rock type and anisotropy; calibrate with lab UCS. Unreliable in weak rock (σc < ~25 MPa).

Source. Broch & Franklin 1972; ISRM 1985 · In this chapter: 2.6 · Full entry and references

Also applicable to this chapter

IX-13Small-strain shear modulus (Hardin)G_max
Gmax = 625 · F(e) · OCRk · Pa0.5 · σ'm0.5
F(e) = 1 / (0.3 + 0.7 e2)

Variables. σ'm = mean effective stress; k = 0 (PI=0) to 0.5 (PI ≥ 100)

Use. Uncemented clays and sands; lab resonant-column basis.

Limitations. Underestimates aged/cemented soils; field Vs (Gmax = ρVs2) is preferred.

Source. Hardin 1978 · Full entry and references

IS-07Undrained shear strength of clay from SPTSᵤ
Su = f1 · N60
f1 ≈ 4.4 kPa (range ~4–6 kPa; higher for low PI)

Variables. f1 varies with plasticity index

Use. Insensitive, overconsolidated clays and weak rocks (U.K. data); PI ≈ 15–65%.

Limitations. Very large scatter; not reliable in soft or sensitive clays where N is very low. Use CPT, vane, or lab tests for design Su.

Source. Stroud 1974 · Full entry and references

IX-05Secondary compression ratioC_α
Cα / Cc ≈ 0.04 ± 0.01   (inorganic clays and silts)
≈ 0.05 ± 0.01 (organic clays and silts); ≈ 0.075 ± 0.01 (peats)

Variables. Cα = Δe / Δlog t

Use. Secondary consolidation of soft soils; the ratio holds at a given effective stress level.

Limitations. Use Cc corresponding to the final stress (Cc varies with stress in structured clays).

Source. Mesri & Godlewski 1977; Mesri & Castro 1987 · Full entry and references

2.1 Background: The Railroad Track Structure

The railroad track structure transmits wheel loads through a layered system:

Rail → Tie (Crosstie) → Ballast → Subballast → Subgrade

The geotechnical consultant is primarily responsible for the subgrade and subballast layers, but must understand the full load path to correctly compute stress at the top of subgrade and specify appropriate materials.

Reference graphics

How to Design a Railway Track
How to Design a Railway Track
2.1.1 Layer Functions
LayerMaterialPrimary Function
Rail115–141 RE steelCarry and distribute wheel load longitudinally
Tie (Crosstie)Concrete or timber, 8.5 ft longDistribute rail load to ballast; maintain gage
BallastCrushed stone (AREMA No. 4 or No. 24)Distribute tie load; drain; damp vibration; resist movement
SubballastGranular filter/transition materialDrainage; frost protection; separate ballast from subgrade
SubgradeNative or engineered fillUltimate load-bearing platform

AREMA MRE Chapter 1 governs ballast and subballast specification for all nine client railroads, with client-specific supplements as noted below.

Reference graphics

Why Do Train Tracks Have Stones
Why Do Train Tracks Have Stones

The substructure, zone by zone

Selig and Waters divide the track at the tie–ballast interface. Rail, fastenings and ties make up the superstructure. Ballast, subballast and subgrade make up the substructure. The substructure gets less attention, but its properties vary far more and are harder to define, and it drives a large share of track maintenance cost.

Ballast zones. Describe and sample each zone separately:

  • Crib: between the ties.
  • Shoulder: beyond the tie ends.
  • Top ballast: the upper part, which tamping disturbs.
  • Bottom ballast: the lower part, which tamping does not reach. It is usually the most fouled.

“Boxing” is the cribs plus the upper shoulders. A clean crib tells you nothing about the bottom ballast.

What the subballast has to do. The book lists seven functions:

  • Reduce stress on the subgrade.
  • Insulate against frost.
  • Keep ballast and subgrade from mixing.
  • Stop subgrade fines from migrating upward.
  • Protect a hard subgrade surface from attrition by the ballast.
  • Shed surface water to the ditches.
  • Let water seeping up from the subgrade escape.

Functions 3 to 5 are the “blanket” functions. Expect track built without subballast to need high maintenance. Stabilized soil, asphalt and geosynthetics can stand in for some of these functions, but not all of them (§2.4; Chapter 17).

How deep the subgrade matters. Train-induced stress is significant to about 16 ft below the bottom of tie. Model studies show that rail deflection is still about half the surface value 80 in. down. The subgrade therefore controls much of the track’s resilience even where stress has dropped off. Set trackbed boring and CPT depths to match (Chapter 5).

Ballast gradation changes in service. Three things change it:

  • Mechanical breakdown from construction, tamping and traffic.
  • Weathering.
  • Fines moving in from the surface and from the layers below.

A specification for clean new ballast only covers its condition on day one.

After Selig & Waters (1994), chs. 1, 2 and 5. Full reference under Supplemental Sources.

Supplemental reference · LEVI Library

Why substructure demands keep rising: heavy axle loads

The AAR Heavy Axle Load program (from 1988, with testing at FAST, Pueblo) led the industry to accept 286,000-lb gross-weight cars in interchange in 1991. By 2010, nearly all coal and about 30% of general freight moved in 286k cars (about 40% of all traffic), and net benefits were about $6 billion from 1994 to 2010. The earlier move to 100-ton (263k) cars in the 1970s had “caused havoc” with track that was adequate for 70-ton cars, and rail fatigue life on tangent track fell from about 580 MGT under mixed freight to 267 MGT under 100-ton unit trains. Phase II economic studies predicted that 286k operation would raise life-cycle costs for rail, ties, ballast and subgrade, turnouts and bridges, mainly through maintenance rather than capital cost:

Table 2-S1. Predicted cost relative to 263k operation (HAL Phase II, Hargrove et al., 1996)

West 286k (80 MGT)West 315kEast 286k (30 MGT)East 315k
Track maintenance111.3%132.7%122.6%147.5%
Track capital102.6%108.6%106.5%110.0%
Bridges112.7%156.9%114.0%137.7%
Operations90.4%93.8%91.1%95.3%
Total92.6%97.5%94%99.6%

Spot surfacing — the maintenance activity most tied to substructure performance — was among those most affected. On short lines, only about 55% of route-miles (63% for regionals) were open to 286k in 2011, and bridges were the main constraint. When a line is upgraded for heavier cars, the subgrade and ballast checks in this chapter should be repeated for the new axle load rather than carried over from the original design.

Source: Martland, C. D. (2013). “Introduction of Heavy Axle Loads by the North American Rail Industry.” Journal of the Transportation Research Forum 52(2): 103–125

How fast the load spreads: contact stress at each layer

Profillidis follows a 22-kip static wheel load down through the track. The contact area grows from about 0.2 in.² at the wheel–rail contact to about 1,550 in.² at the track bed–subgrade interface, and the stress falls from about 110,000 psi to about 6 psi — a reduction of 1,000 to 5,000 times. The calculation assumes the tie under the wheel carries 40% of the wheel load (finite-element and field results, see §2.2) and ignores dynamic effects.

He defines the subgrade as extending to about 6.5 ft below the top of subgrade, the depth to which train loading has a mechanical effect. That depth is a useful minimum for exploration and for the zone over which subgrade parameters are needed.

Figures · click to zoom

Figure 2-11. Base area of each track component and the stress it carries under a 11-ton wheel load. Profillidis Fig. 7.3.
Figure 2-11. Base area of each track component and the stress it carries under a 11-ton wheel load. Profillidis Fig. 7.3.

After Profillidis (2014), §7.2, Fig. 7.3. Full reference under Supplemental Sources.

Field view: typical ballast section and how load spreads

Table 2-18. Typical ballast layer dimensions (course guidance)
ParameterTypical value
Depth below ties12–18 in. (8 in. for yard and secondary track)
Shoulder width, tangent and inside of curves8–12 in.
Shoulder width, outside of curves12–18 in.
Shoulder slope2:1 to 3:1 (excess width or slope can block internal drainage)

Stress under passing trains is about 6,000 psf just below the ties and falls to about 200 psf at 5 ft depth, before any dynamic allowance. At the rail, a loaded tank car’s weight spreads over about 19 ft (roughly 11 ties), and it continues to spread through the ballast and subgrade. A thin or degraded ballast and sub-ballast section concentrates stress into a smaller area of subgrade than the design assumed. The course states that substructure condition is the leading cause of track-geometry degradation, and that the substructure is what fails about 80% of the time when track has a problem.

Figures · click to zoom

Figure 2-42. Axle-load distribution at the rail: a car’s weight spread over roughly 19 ft.
Figure 2-42. Axle-load distribution at the rail: a car’s weight spread over roughly 19 ft.
Figure 2-43. The same load spreading through the ballast.
Figure 2-43. The same load spreading through the ballast.
Figure 2-44. Load reaching the subgrade over a much larger area, if the structure above is intact.
Figure 2-44. Load reaching the subgrade over a much larger area, if the structure above is intact.

After Geotechnology for Railroaders Program, Module 3; §02–03, §13. Full reference under Supplemental Sources.

2.2 Load Distribution — Talbot Method

The Talbot (1920) equation distributes rail wheel load through the track structure to estimate contact pressure at the base of the tie (subgrade of the ballast):

p = P / (3 × L × U^(1/3)) [AREMA MRE Ch. 1, Sec. 1.3.5]

However, the more commonly used formulation for stress at the top of subgrade is the simplified Talbot distribution that treats the ballast and subballast as a combined bearing layer.

Reference graphics · click to zoom

Track Design Calculations
Track Design Calculations
2.2.1 Stress at Top of Subgrade

The vertical stress at the top of subgrade beneath a single tie is estimated using the Talbot stress distribution:

σ_s = (P_d) / (A_eff) (psf)

where:

P_d = P_w × DLF (lb, dynamic wheel load)

A_eff = (B_t + 2 × d × tan θ) × (L_t + 2 × d × tan θ) (ft²)

  • P_w = static wheel load (lb); for Cooper E-80: P_w = 80,000 lb per axle = 40,000 lb per wheel (per AREMA Ch. 8)
  • DLF = dynamic load factor (1.2 to 1.5 by client; see Introduction)
  • B_t = tie width = 0.667 ft (8 in.) for concrete ties, 0.583 ft (7 in.) for timber
  • L_t = tie length = 8.5 ft
  • d = combined ballast + subballast thickness (ft)
  • θ = pressure distribution angle = 35° (AREMA Ch. 1 default); tan(35°) = 0.700

For a single dynamic wheel load P_d = 40,000 × 1.3 = 52,000 lb and d = 2.0 ft (24 in. ballast + 12 in. subballast):

A_eff = (0.667 + 2 × 2.0 × 0.700) × (8.5 + 2 × 2.0 × 0.700)

= (0.667 + 2.80) × (8.5 + 2.80)

= 3.467 × 11.30 = 39.2 ft²

σ_s = 52,000 / 39.2 = 1,327 psf = 0.66 tsf

This is the design stress at the top of subgrade used for bearing capacity checks and to assess subgrade failure potential.

Which design variables actually move the stresses

Selig and Waters ran a multilayer model study (GEOTRACK, 32,900-lb wheel) to see which design choices change rail seat load, ballast pressure and subgrade stress most. Use it to decide where design effort pays.

Table 2-SW1. Sensitivity of track response to design variables (multilayer model)
ChangeEffect
Tie spacing 10 → 36 in.Rail seat load ×3; stress at ballast surface ×4; subgrade stress +50%
Rail moment of inertia 38.7 → 150 in.4Rail seat load −40%
Ballast depth 24 → 6 in.Subgrade stress more than doubles: the strongest lever on subgrade stress
Ballast modulus 100,000 → 8,000 psiBallast strain ×9
Tie stiffnessStiff ties act as rigid footings and push peak ballast pressure to the tie ends; flexible ties peak under the rail seat. Subgrade stress is similar either way.

Rail seat load is shared about 36% by the tie under the wheel, 22% by each adjacent tie and 10% by the next.

Quick hand checks.

  • Maximum rail seat load ≈ maximum rail support force per unit length × tie spacing.
  • Average pressure at the tie base ≈ 2 × rail seat load ÷ tie bearing area.

Measured values for comparison. At FAST, wheel loads of 14,000 to 32,900 lb gave the following:

  • Subgrade stress under concrete ties: 6.8–10.1 psi.
  • Subgrade stress under wood ties: 3.8–5.7 psi.
  • Resilient subgrade deflection: 0.025–0.033 in.

Ballast type (limestone, traprock or granite) had no detectable effect on the resilient response. These values are consistent with the roughly 10-psi subgrade stress in Table 2-1, which makes them a useful reasonableness check.

After Selig & Waters (1994), ch. 5. Full reference under Supplemental Sources.

2.2.2 AREMA Stress at Subgrade — Simplified Table
Table 2-1. Approximate σ_s at Top of Subgrade (Cooper E-80, DLF = 1.3)
Ballast + Subballast Thickness (in.)σ_s (psf)σ_s (tsf)
182,1901.10
241,3270.66
309000.45
366600.33
425100.26
484100.21

Subgrade bearing capacity is checked against σ_s. For soft fine-grained subgrades (CBR < 4), ballast and subballast thickness ≥ 36 in. is typically required to reduce stress to manageable levels.

AREMA subgrade-pressure equations and allowable pressure by soil type

AREMA allows several equations for stress at the top of subgrade:

  • Talbot: Pc = 16.8 Pm / h1.25 (h in inches). It is empirical and was calibrated on lighter loads.
  • Japanese National Railways: Pc = 50 Pm / (10 + h1.35) (h in cm).
  • Boussinesq.
  • Love’s circular-area solution.

Here Pm = 2 × rail seat load × impact factor ÷ effective tie bearing area. The effective area and the limit on Pm depend on tie type:

  • Wood ties: about two-thirds of the tie bearing area; Pm ≤ 65 psi.
  • Concrete ties: the full bearing area; Pm ≤ 85 psi.

The traditional universal subgrade limit of 20 psi is too high for soft soils and too conservative for strong ones. Table 2-SW2 gives soil-specific values.

Table 2-SW2. Allowable subgrade pressure by soil type (0.6 × NAVFAC static allowable)
Subgradepsi
Compact till or hardpan65–100
Gravel, very compact / loose55–85 / 25–50
Coarse-to-medium sand, very compact / loose30–50 / 15–25
Fine sand, loose8–15
Clay, very stiff to hard25–50
Clay, medium to stiff8–25
Clay, soft4–8
Silt, very stiff / soft15–30 / 4–8

These values come from static bearing practice and may still be unconservative under millions of load repetitions. For soft or wet fine-grained subgrade, check the granular depth with the threshold-stress approach in §2.4.2.

After Selig & Waters (1994), ch. 10. Full reference under Supplemental Sources.

Load sharing between ties, dynamic increment and subgrade stress (finite-element results)

The classical assumption is that the tie under a wheel carries 50% of the wheel load and each neighbor 25%. Stress measurements and finite-element analysis give a different split: 40% on the tie under the load, 23% on each adjacent tie and 7% on each second tie, with negligible effect beyond.

Track and wheel defects add a dynamic load, so analysis should use Qtot = Qstat + Qdyn, where Qdyn can reach 50% of the static wheel load. For a 11-ton wheel at 124 mph the measured increment was 4.4–6.6 tons. The book separates three frequency bands: 0.5–15 Hz (sprung mass, rolling-stock dependent), 20–100 Hz (unsprung mass, governed by track quality and stiffness) and 100–2,000 Hz (rail corrugation). Empirical dynamic impact factors close to measured values range from 1.35 to 1.6 at 125 mph, and 1.5 is suggested near that speed. Compare these with the AREMA impact allowance used in this section, which remains the design basis.

Elastoplastic finite-element runs (Figure 2-14) show that stress at the top of subgrade depends mainly on subgrade quality and only secondarily on track-bed thickness. With all else equal, moving the subgrade up one class (S1→S2, S2→S3, S3→rock) increases the stress developed in the subgrade by about 50%: a stiffer subgrade attracts more load, but carries it with far less settlement.

Figures · click to zoom

Figure 2-12. Distribution of a wheel load over successive ties: 7%, 23%, 40%, 23%, 7%. Profillidis Fig. 8.10.
Figure 2-12. Distribution of a wheel load over successive ties: 7%, 23%, 40%, 23%, 7%. Profillidis Fig. 8.10.
Figure 2-13. Track defect producing an additional dynamic load Qdyn on top of the static load Qstat. Profillidis Fig. 8.14.
Figure 2-13. Track defect producing an additional dynamic load Qdyn on top of the static load Qstat. Profillidis Fig. 8.14.
Figure 2-14. Vertical stress at the subgrade level vs. track-bed thickness e (ballast + subballast) for subgrade classes S1–S3 and rock, by tie type. Profillidis Fig. 8.7.
Figure 2-14. Vertical stress at the subgrade level vs. track-bed thickness e (ballast + subballast) for subgrade classes S1–S3 and rock, by tie type. Profillidis Fig. 8.7.
Figure 2-15. Dynamic impact factor η vs. speed according to various theories and measurements. Profillidis Fig. 8.15.
Figure 2-15. Dynamic impact factor η vs. speed according to various theories and measurements. Profillidis Fig. 8.15.

After Profillidis (2014), §7.11.2, §8.4.7–8.4.8, §8.6–8.7, Figs. 8.7, 8.10, 8.14, 8.15. Full reference under Supplemental Sources.

How the track spreads a wheel load, and why no component can be designed alone

The track is a load-spreading system. It takes a concentrated wheel load at the rail head and spreads it along the track, across it and down through the section until the subgrade can carry it. Track that is well designed, built and maintained shares the load evenly, so each component carries its part. The designer’s job, on new track or on an upgrade of existing track, is to select a section that carries the design wheel load without overstressing any of the four main components: rail, ties, ballast and subgrade.

Along the track. When a wheel sits directly over a tie, that tie carries less than half of the wheel load. The rest goes to the two ties on each side (Figure 2-S5). For a 30,000-lb wheel on good track the UFC example split is 40% / 20% / 10%. That is close to the 40 / 23 / 7 finite-element split given above.

Down through the section. Pressure at the wheel–rail contact, about 60,000 psi over roughly ½ sq in., falls to about 300 psi on the tie plate, about 40 psi at the base of the tie and about 10 psi (1,440 psf) at the top of subgrade (Figure 2-S6). That is the same order as the Table 2-1 values for 18 to 24 in. of ballast and subballast, so it is a quick reasonableness check on a Talbot calculation. Actual pressures vary with wheel load, track section and track condition.

Figures · click to zoom

Example load sharing along the track: a 30,000-lb wheel centered over tie 3. UFC 4-860-01FA Fig. 6-10.
Figure 2-S5. Example load sharing along the track: a 30,000-lb wheel centered over tie 3. UFC 4-860-01FA Fig. 6-10.
Example vertical pressure reduction from rail head to subgrade under a 30,000-lb wheel. UFC 4-860-01FA Fig. 6-11.
Figure 2-S6. Example vertical pressure reduction from rail head to subgrade under a 30,000-lb wheel. UFC 4-860-01FA Fig. 6-11.

Design point. Track is simple to build, but its behavior under load is not. Strengthening one component can increase the load on another. When a rehabilitation changes one component (rail section, tie type or spacing, ballast depth), recheck the others, including the stress at top of subgrade in §2.2.1.

After UFC 4-860-01FA (2004), ch. 6, §5, Figs. 6-10 and 6-11. Comparison with §2.2 and Table 2-1 added by Benesch. Full reference under Supplemental Sources.

Selecting the design wheel load from the car mix

Set the design wheel load from the heaviest loaded car that commonly runs over the track, not the rare heaviest movement. A locomotive usually puts down the heaviest single wheel. On most track, though, loaded-car wheels far outnumber locomotive wheels, so the car wheel load governs in most cases. Check both before the design is final.

The design wheel load is the static wheel load of that car plus an allowance for speed and for track and wheel irregularities. Table 2-S8 gives planning values for slow-speed track:

  • 10–25 mph: connecting track between the site and the serving railroad.
  • ≤ 10 mph: yard, industry-lead and terminal track.
  • Light use: track used mainly by a switch engine, for empty-car storage or only occasionally.
Table 2-S8. Planning design wheel loads by car type and track use (lb per wheel)
Most common heavy car10–25 mph≤ 10 mphLight use
Box, 40T20,00017,60016,000
Box, 50T26,25023,10021,000
Box, 70T34,37530,25027,500
Flat, 40T17,50015,40014,000
Flat, 50T23,75020,90019,000
Flat, 80T (6-axle)23,75020,90019,000
Flat, 100T (6-axle)32,50028,60026,000
Flat, 140T (6-axle)38,75034,10031,000
COFC, 70T30,00026,40024,000
COFC, double stack50,00044,00040,000
TOFC, 70T30,00026,40024,000
Gondola, 40T high side18,75016,50015,000
Gondola, 50T22,50019,80018,000
Tank, 7,500 gal16,25014,30013,000
Tank, 10,000 gal22,50019,80018,000
Tank, 20,000 gal36,25031,90029,000
Hopper, 50T21,25018,70017,000
Hopper, 70T30,00026,40024,000
Hopper, 100T (263K)41,12536,19032,900
Hopper, 120T (286K)44,75039,38035,800
Hopper, 125T (315K)49,25043,34039,400
Locomotive, EMD GP7 / GP937,50033,00030,000
Locomotive, EMD SW831,25027,50025,000
Locomotive, 80-ton industrial25,00022,00020,000
Locomotive, GE 65-ton20,00017,60016,000
Locomotive, GE 40-ton13,75012,10011,000

Benesch check: the Light use column equals the static wheel load (gross rail load ÷ 8 for a four-axle car; e.g., 286,000 ÷ 8 ≈ 35,800 lb). The ≤ 10 mph and 10–25 mph columns are the static value × 1.10 and × 1.25.

Limits on use. These speed allowances are lower than the 1.2 to 1.5 dynamic load factors used elsewhere in this manual because they assume slow operation. Use Table 2-S8 only for industrial, yard, terminal and light-density track. For mainline work, use Cooper E-80 or 286,000-lb loading with the client’s dynamic load factor (Part I, §I.4).

After UFC 4-860-01FA (2004), ch. 2, §4, Table 2-2. Car and locomotive designations as given in the source; factor check added by Benesch. Full reference under Supplemental Sources.

Dynamic loads, rare heavy impacts and the fourth-power rule

How large the dynamic load is depends on the traffic. North American static wheel loads range from about 12,000 lb (light rail) to 39,000 lb (heavy haul). Measured dynamic loads compare as follows:

  • FAST heavy-haul unit trains with good wheels: dynamic loads were close to static.
  • Northeast Corridor mixed traffic: dynamic loads ran well above static at the 2% exceedance level. Almost all of the excess came from passenger cars (23,000-lb static wheels) with wheel flats at 80–110 mph.
  • Continuous welded rail with good maintenance: dynamic loads typically run 10–20% above static.
  • Wheel and rail defects: loads near 3× static, with vibration above 100 Hz.

Rare heavy loads can control settlement. In box tests the order of loading did not change the final settlement. Once the largest load had been applied, smaller loads added almost nothing. A small share of heavy impacts, even 1 in 1,000, can therefore govern ballast settlement. Removing wheel flats, battered joints and rail defects is a substructure measure as well as a rail measure.

Uplift. The rail lifts the tie ahead of the wheel and then drives it back down. Where water is present, this pumps it.

Axle load and maintenance cost. German (DB) experience puts ballast maintenance cost roughly in proportion to the fourth power of ballast pressure, and British Rail concurs. By that rule, a 20% increase in axle load (for example, 100-ton to 125-ton cars) about doubles ballast maintenance. In box tests, raising the wheel load from 36 to 50 kips doubled the fines produced and tripled coarse breakage. DB responded with these changes:

  • 24-in. tie spacing.
  • 8.5-ft ties.
  • 60 kg/m (121 lb/yd) rail.

Together they stretched tamping intervals from 1–2 years to 4–5 years. British Rail found lab settlement roughly proportional to axle load and to tie spacing. Going from 113 to 131 lb/yd rail (56 to 65 kg/m) cut settlement about 20%. Use these figures when a client asks what a heavier car fleet will cost in substructure maintenance (Chapter 1, §1.11).

After Selig & Waters (1994), chs. 2, 6 and 8. Full reference under Supplemental Sources.

2.3 Ballast Specification
2.3.1 AREMA Ballast Gradations

AREMA MRE Chapter 1, Table 1-4.4-1 defines standard ballast gradations. The two most common for North American mainline freight service:

Table 2-2. AREMA Standard Ballast Gradation
Sieve SizeAREMA No. 4 (% Passing)AREMA No. 24 (% Passing)
2½ in.100100
2 in.90–10090–100
1½ in.25–6060–90
1 in.0–1010–35
¾ in.0–50–15
½ in.—0–5
No. 40–10–1

AREMA No. 4 is preferred for mainline heavy-axle freight (CSXT, NSR, UPRR, BNSF, CN). AREMA No. 24 (smaller size) is used by some clients (Amtrak, commuter rail) for improved ride quality and tamping.

2.3.2 Ballast Quality Requirements

Per AREMA Chapter 1, Section 1.4.4:

  • Los Angeles Abrasion loss: ≤ 35% (mainline Class I: ≤ 30%)
  • Sodium sulfate soundness: ≤ 5% (magnesium sulfate: ≤ 10%)
  • Flat and elongated particles: ≤ 5% (length > 3× width)
  • Unit weight: ≥ 95 pcf (ASTM C29)
  • Absorption: ≤ 1.0% (preference; < 0.5% for freeze-thaw climates per CPKC and CN)

Client-specific ballast quality requirements:

RailroadLA Abrasion (max)Soundness (max)Preferred Rock TypeGoverning Standard
CSXT30%5% Na₂SO₄Granite, limestoneCSXT Eng. Std. Sec. 6
NSR30%5% Na₂SO₄Granite, quartziteNSR Eng. Std. Manual Sec. 6
G&W35%10% MgSO₄Local quarry approvalG&W Eng. Bulletin
UPRR30%5% Na₂SO₄Granite, basaltUPRR Eng. Instr. Manual
BNSF30%5% Na₂SO₄Granite, limestoneBNSF Eng. Instructions
CPKC30%5% Na₂SO₄Granite (freeze-thaw)CPKC Track Standards
Amtrak30%5% Na₂SO₄Granite preferredAmtrak Eng. Std.
CN30%5% Na₂SO₄Granite (freeze-thaw)CN Eng. Standards

Reference graphics

Los Angeles Abrasion Test for Aggregate
Los Angeles Abrasion Test for Aggregate
Aggregate Testing
Aggregate Testing

Screening a ballast source beyond LA Abrasion

Petrography first. A thin-section examination flags rock that will break down in track whatever the index tests say. Selig and Waters list these “fatal flaws” (after Watters et al.):

  • High content of soft minerals (clay, mica, chlorite).
  • Argillaceous sedimentary rock (mudstone, shale).
  • Mica-rich metamorphic rock (slate, phyllite, schist).
  • Igneous rock with altered feldspar.
  • Sulfide content above 2–3%; pyrite oxidizes to acid.
  • Poor consolidation, or porosity above 5%.
  • Vesicular volcanics.
  • Friable crystalline rock.
  • Closely spaced joints, bedding or foliation.
  • Smooth particle surfaces, or tabular or elongated particles.

Abrasion tests measure different things.

  • LA Abrasion measures toughness. Its fines are mostly coarser than the No. 200 sieve.
  • Mill Abrasion (wet, 10,000 revolutions) measures hardness. Over 90% of its fines pass the No. 200 sieve, which is closer to what track produces.
  • Canadian Pacific combines the two as the Abrasion Number, AN = LAA + 5 × MA. CP pairs AN with gradation to estimate ballast life in MGT.

In an AAR/Santa Fe test at about 300 MGT per year, fouling (minus No. 4) grew 0.4–0.6% per year, and 75–90% of it came from ballast breakdown. Fouling correlated with AN.

Shape. AREA adopted the Corps definitions in 1986: flat means thickness ÷ width < 1/3, and elongated means length ÷ width > 3, with a limit of 5% by weight. Flaky, angular particles raise shear strength, but they also break more, accumulate more permanent strain and lower stiffness.

Gradation. In laboratory tests, uniform ballast (Cu 1.14) showed about twice the plastic strain and 4–5 times the degradation of a broader gradation (Cu 4.1). The broader grading is stronger and settles less. But it has less void space to store fines, it can segregate, and it is more susceptible to fouling. CP ranks coarse uniform gradations best for fouling life, then fine uniform, then broad. The book finds no basis for a single optimum size. Durability and room to store fines govern.

Other indicators. Higher specific gravity goes with durability. Low absorption goes with weathering resistance. Higher rodded unit weight goes with lateral stability. Where limestone or other soft stone sits in wet track, a wet attrition (Deval) test is worth requesting. British Rail limited it to 4%.

After Selig & Waters (1994), chs. 3, 7 and 8. Full reference under Supplemental Sources.

Supplemental reference · LEVI Library

Additional ballast quality screens

Section 2.3.2 gives the AREMA limits. Li et al. (2016) add two screens that are worth requesting when qualifying a new quarry: the Mill Abrasion test (Selig & Waters, 1994), which wears the stone in water and is more sensitive than LA Abrasion to the soft, clay-bearing rocks that turn to mud in track, and petrographic analysis of the parent rock. Canadian Pacific’s limits show how far a freeze–thaw railroad tightens the AREMA values:

Table 2-S2. AREMA vs. Canadian Pacific ballast limits (Li et al., 2016, Table 3.3)

TestProcedureAREMACPR
Los Angeles AbrasionASTM C53535% max.45% max. (paired with Mill Abrasion)
Mill AbrasionSelig & Waters (1994)–9% max.
AbsorptionASTM C1271.0% max.0.5% max.
Sulfate soundnessASTM C885.0% max.1.0% max. (mainline)

Table 2-S3. Rock properties that lead to poor ballast performance (after Watters et al., 1987)

Rock propertyDeterioration problem
Soft minerals (e.g., clay shale)Rapid wear and crushing
Minerals that weather or deteriorate rapidlyWeathering of the stone in track
Poorly consolidated textureRapid abrasion
High porosityFreeze–thaw deterioration
Smooth particle surfacePoor stability
Long, flat particle shapePoor stability; breakage of elongated pieces

Li et al. recommend petrographic analysis of the parent rock whenever a new source is being qualified, because it shows secondary minerals and textures that the index tests can miss.

Source: Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis

European ballast categories (EN 13450) for comparison with AREMA

The European standard designates ballast by a pair of sieve sizes, 1¼ in. lower and 2 in. or 2½ in. upper, and lets the supplier declare a category for each property. The Los Angeles test is the reference hardness test (in the EN version: 22-lb sample, 1,000 revolutions at 31–33 rpm). Many older regulations simply require LA < 25.

Table 2-9. EN 13450 ballast categories by Los Angeles and Micro-Deval coefficient
Los Angeles coefficientCategoryMicro-Deval coefficientCategory
≤ 12LARB12≤ 5MDERB5
≤ 14LARB14≤ 7MDERB7
≤ 16LARB16≤ 11MDERB11
≤ 20LARB20≤ 15MDERB15
≤ 24LARB24> 15declared
> 24declared
Table 2-10. EN 13450 limits on fines, fine particles and flakiness
PropertyCategory limits
Fine particles (passing No. 35)A: 0.6%  ·  B: 1.0%  ·  declared > 1.0%
Fines (passing No. 230)A: 0.5%  ·  B: 1.0%  ·  C: 1.5%  ·  declared > 1.5%
Flakiness index≤ 15, ≤ 20, ≤ 35, declared > 35
Shape index≤ 10, ≤ 20, ≤ 30, 5–35, declared > 30
Particles ≥ 4 in. long (sample > 88 lb)A: 4%  ·  B: 6%  ·  C: 8%  ·  D: 12%

Deval requirements in older regulations range from a coefficient greater than 12 (limestone) or 14 (hard rock) to greater than 16, which may exclude limestone and push a railway toward granite. French practice requires the LA and Deval results to plot together inside an acceptance band (Figure 2-18).

Figures · click to zoom

Figure 2-16. Typical gradation of normal ballast with “excellent” and rejection limits, French regulations. Profillidis Fig. 12.1.
Figure 2-16. Typical gradation of normal ballast with “excellent” and rejection limits, French regulations. Profillidis Fig. 12.1.
Figure 2-17. Gradation of railway ballast by grading category, EN 13450 (1¼–2 in. and 1¼–2½ in.). Profillidis Table 12.2.
Figure 2-17. Gradation of railway ballast by grading category, EN 13450 (1¼–2 in. and 1¼–2½ in.). Profillidis Table 12.2.
Figure 2-18. Acceptable combination of Los Angeles and Deval coefficients, French regulations. Profillidis Fig. 12.5.
Figure 2-18. Acceptable combination of Los Angeles and Deval coefficients, French regulations. Profillidis Fig. 12.5.

After Profillidis (2014), §12.2–12.4, Tables 12.2–12.9, Figs. 12.1, 12.5; after EN 13450 (2002). Full reference under Supplemental Sources.

Ballast shoulder, crib fill and lateral track resistance

Lateral (transverse) track resistance has three parts: friction under the tie (proportional to tie weight), friction along the tie sides from crib ballast, and passive resistance at the tie ends from the shoulder. The crib component is about 40–50% of the total for timber ties, 30% for monoblock concrete and 15–25% for twin-block ties, so under-filled cribs cost timber track the most.

  • Widening the shoulder and heaping it above tie level gives more resistance than widening alone; the shoulder slope matters less (Figure 2-20).
  • Immediately after tamping, lateral resistance is about 50% of its stabilized value. It is almost fully recovered after about 2 million tons of traffic; dynamic stabilization and crib compaction shorten the recovery (Figure 2-21).
  • Fully stabilized twin-block concrete track resists more than twice as much as timber; monoblock concrete sits between. Lengthening ties from 8 ft to 8.5 ft (German practice) added 15–20%. Hard, smooth tropical-hardwood ties give about 15% less than other timber; grooving their seat adds 20–25%.
  • Closer tie spacing slightly lowers resistance per tie but raises it per unit length of track.

These numbers explain why slow orders follow surfacing and undercutting, and why shoulder width and crib fill should be checked wherever a ground-hazard repair has disturbed the ballast section.

Figures · click to zoom

Figure 2-19. Tie end, ballast shoulder width c and shoulder heap height h. Profillidis Fig. 13.2.
Figure 2-19. Tie end, ballast shoulder width c and shoulder heap height h. Profillidis Fig. 13.2.
Figure 2-20. Lateral resistance vs. shoulder width c, with and without a heaped shoulder. Profillidis Fig. 13.3.
Figure 2-20. Lateral resistance vs. shoulder width c, with and without a heaped shoulder. Profillidis Fig. 13.3.
Figure 2-21. Recovery of lateral resistance after maintenance vs. traffic, with and without crib compaction. Profillidis Fig. 13.6.
Figure 2-21. Recovery of lateral resistance after maintenance vs. traffic, with and without crib compaction. Profillidis Fig. 13.6.
Figure 2-22. Lateral resistance by tie type (timber, steel, monoblock, twin-block). Profillidis Fig. 13.7.
Figure 2-22. Lateral resistance by tie type (timber, steel, monoblock, twin-block). Profillidis Fig. 13.7.

After Profillidis (2014), §13.3–13.6, Figs. 13.2, 13.3, 13.6, 13.7. Full reference under Supplemental Sources.

The six functions of ballast and what good ballast requires

Ballast does six jobs: drainage, load distribution, vertical stiffness, longitudinal hold, lateral hold, and making surfacing practical. Failure of a function shows in the geometry: 2.5 in. or more of rail deflection at a joint means load distribution has failed, uneven support shows as cross-level, and ballast plowed in the direction of travel means it is too fine to hold the track. Judge ballast by digging, not by the surface.

Ballast shear strength comes from friction, which depends on size, angularity and interlocking. Prefer hard, dark, fine-grained extrusive rock (andesite, basalt, micro-diorite). Limestone, quartz, metamorphic rock and shale are unsuitable, and soft rock can grind into a mud spot within 2–3 years. Ballast life is roughly 200–900 MGT depending on rock type: some limestone lasts about 300 MGT, andesite about 900 MGT.

Shoulder width is a standard to enforce, not tolerate. A minimum 12-in. shoulder is what holds the ties laterally, and inadequate shoulders can contribute to derailments.

Figures · click to zoom

Figure 2-45. Angular, dark, extrusive rock: the preferred ballast material.
Figure 2-45. Angular, dark, extrusive rock: the preferred ballast material.
Figure 2-46. Cross-level deviation, the visible symptom of uneven substructure support.
Figure 2-46. Cross-level deviation, the visible symptom of uneven substructure support.
Figure 2-47. Exposed tie ends with no standard shoulder: a lateral-restraint deficiency.
Figure 2-47. Exposed tie ends with no standard shoulder: a lateral-restraint deficiency.

After Geotechnology for Railroaders Program, Module 3, Module 2; Module 3 §04–05, §11; after Selig & Waters (1994). Full reference under Supplemental Sources.

Project management · Seeley (1993)

Taking Off Ballast, Ties and Track: A Worked Example

Seeley’s chapter on measuring rail track (CESMM3 Class S) sets out conventions that carry over to North American work:

  • Supply and laying are separate items, because the owner often furnishes track materials. Track foundations (ballast) are the exception: one item covers both supplying and placing them.
  • Bottom ballast and top ballast are separate items. Bottom ballast is placed before the track is laid; top ballast is placed after.
  • No deduction for ties. The volume of top ballast is measured without deducting the space the ties occupy. The ballast rate includes boxing, trimming to line and level, and tamping.
  • Ties are counted as track length divided by tie spacing, plus one.
  • Track laying is measured along the centerline, including the length through turnouts and diamonds. Turnouts and diamonds are also enumerated by type, and curves are “extra over” items split at a radius of about 984 ft (roughly a 5.8° curve).
  • Lifting, packing and slewing existing track is enumerated, stating the track length, the maximum lift and the maximum slew.

His example is 492 ft of straight single track with ballast 10.33 ft wide, a 6-in. bottom ballast layer and about 5 in. of top ballast, timber ties at 29.5-in. centers, and 113 lb/yd rail.

Table 2-PM1. Table: Take-off for 492 ft of single track (after Seeley 1993, Example XVIII, converted to US units)

ItemCalculationQuantity
Bottom ballast492 × 10.33 × 0.49 ft92.7 CY
Top ballast (no deduction for ties)492 × 10.33 × 0.43 ft80.3 CY
Ties492 ft / 2.46 ft + 1201 each
Rail, supply only2 rails × 492 ft at 113 lb/yd18.5 tons
Track layingcenterline length492 ft

For railroad work: when a geotechnical design calls for undercutting and new subballast and ballast, give the quantities in the same structure that the track contractor and the railroad’s material desk use. List separately:

  • subballast, as a compacted neat volume converted to tons
  • bottom ballast placed before the track panel goes down
  • top ballast placed after it
  • surfacing passes
  • track lift or slew, with its maximum value

State whether the ballast volume deducts the ties, and convert to tons with a unit weight measured for the actual quarry source. That way the engineer’s tonnage and the tonnage the railroad orders are computed on the same basis.

Source: Seeley, I. H. (1993). Civil Engineering Quantities, 5th ed. Basingstoke: The Macmillan Press, pp. 237–241. Summarized and paraphrased. Full reference under Supplemental Sources.

2.4 Subballast Requirements and Blanket Layer Design
2.4.1 Subballast Gradation

Subballast serves as a transition filter between ballast and subgrade, provides drainage, and distributes load. AREMA Chapter 1, Section 1.4.5 specifies:

Table 2-3. AREMA Subballast Gradation
Sieve% Passing
1½ in.100
¾ in.55–85
No. 430–60
No. 1020–50
No. 4010–25
No. 2000–7

Filter compatibility between subballast and subgrade must be verified using Terzaghi filter criteria:

D₁₅(subballast) / D₈₅(subgrade) < 5 (piping criterion)

D₁₅(subballast) / D₁₅(subgrade) > 5 (permeability criterion, for drainage)

Reference graphics

Layered Aggregate Sample – Road Construction
Layered Aggregate Sample – Road Construction

Subballast material, filter and placement criteria

Material. Selig and Waters base North American subballast requirements on ASTM D1241:

  • The coarse fraction is durable, with LA Abrasion ≤ 50%. This is higher than the ballast limit because contact stresses are lower.
  • The fraction finer than No. 40 has LL ≤ 25 and PI ≤ 6.
  • No clay lumps or organic matter.

Under saturated repeated loading, crushed rock with no plastic fines performed best and natural rounded gravel performed worst.

Filter criteria. The subballast must satisfy these against the subgrade below and against the ballast above:

  • D15(filter) ≤ 5 × D85(soil): retention.
  • D50(filter) ≤ 25 × D50(soil): avoids gap grading.
  • D15(filter) ≥ 4–5 × D15(soil): drainage. Apply this only where water must drain up out of the subgrade. It can be disregarded on embankments or sand subgrade.

For medium- to high-plasticity clay with no silt or sand, D15 of the filter may be up to 0.016 in., provided Cu ≤ 20 to limit segregation. Confirm with a repeated-load filter test, because the criteria were developed for steady seepage.

Permeability balance. Subballast should be at least 10 times less permeable than the ballast, with a sloped surface, so that rain sheds sideways instead of soaking the subgrade. It still needs to be more permeable than the subgrade so upward seepage can escape. In frost areas, do not add fines to lower the permeability.

When one gradation will not work. A single layer between AREMA No. 4 ballast and a fine subgrade would have to span fine gravel to silt. In that case, use two layers. The upper, coarser layer is matched to the ballast. The lower layer is a blanketing sand matched to the subgrade (Table 2-SW3).

Table 2-SW3. British Rail blanketing sand gradation
Sieve% passing
½ in.100
No. 880–100
No. 1670–90
No. 3048–76
No. 5024–60
No. 1005–42
No. 2000–10

Frost. Where frost and water can reach the subballast, keep silt plus clay below about 5%.

Placement. Shape and compact the subgrade to drain before placing subballast. Then:

  • Place in loose lifts of 4–6 in. and roller-compact at suitable moisture.
  • Make each distinct layer at least 6 in. thick when compacted, to allow for construction variability.

After Selig & Waters (1994), ch. 9. Full reference under Supplemental Sources.

2.4.2 Blanket Layer (Engineered Fill Layer)

Where native subgrade is soft (CBR < 3) or frost-susceptible, a blanket layer of select granular material is required between the subgrade and subballast. This is often called a "capping layer" or "sub-base" in international railroad practice.

Minimum blanket thickness to reduce σ_s to acceptable level:

From Table 2-1, select d (ballast + subballast + blanket total) to achieve σ_s ≤ σ_allow(subgrade).

For soft clay subgrade with q_u = 1,200 psf, AREMA recommends:

σ_allow = q_u / (π + 2) × FS where FS ≥ 3.0 for cyclic loading

σ_allow = 1,200 / (5.14 × 3.0) = 78 psf

This requires d ≥ 54 in. from Table 2-1, or supplemental ground improvement (see Chapter 17).

Granular layer depth: minimums and the threshold-stress method

Typical minimums. North American practice has used the following:

  • Ballast: 6–12 in..
  • Subballast: 4–12 in..
  • The AREA norm: 12 in. of ballast plus 6 in. of subballast, 18 in. in total.

These values set ballast depth for tamping, fines storage and filtering. They do not, by themselves, protect a weak subgrade. Size the combined ballast and subballast (the “granular layer”) separately, to prevent progressive shear and excessive cumulative plastic settlement.

Threshold stress. Repeated-load triaxial tests show a cyclic deviator stress that separates two behaviors:

  • Below it, plastic strain accumulates at a decreasing rate and the soil stabilizes.
  • Above it, plastic strain accumulates at an increasing rate and the soil runs away to failure.

The threshold rises roughly linearly with confining stress. British Rail sets the granular depth where the traffic-induced stress drops to the threshold stress. For example, a 16-tonne (35-kip) axle on a subgrade with a 8.7-psi threshold needs about 24 in..

British Rail practice.

  • Take the threshold as about 50% of the unconfined or undrained triaxial strength, or estimate it from subgrade modulus, CBR or a soil description.
  • Raise the design axle load 15–30% for vehicle body roll.
  • Use greater depth for cohesive clays.
  • Refer very soft soils and peat to a specialist.

Field validation. Subgrade movement (mm per million axles) was rapid where the actual granular depth was less than the design depth and slow where it was greater. Deepening the ballast stabilized a previously unstable site.

This method complements the Li–Selig method above. Use the threshold check as a quick screen, and use Li–Selig where the design tonnage and cumulative deformation must be shown explicitly.

After Selig & Waters (1994), ch. 10. Full reference under Supplemental Sources.

Supplemental reference · LEVI Library

Choosing a granular layer thickness method

The Talbot-type equation in AREMA (H = 0.24 (Pm/Pc)0.8, with a universal allowable subgrade stress of 20 psi) dates from field tests in the 1910s–1920s. Li et al. note it ignores subgrade type, repeated loading and material quality, so it is unconservative on soft soils and overly conservative on good ones. They compare four methods:

Table 2-S7. Comparison of granular layer design methods (Li et al., 2016, Table 5.1)

FeatureAREMA equationsRaymondBritish RailLi–Selig
TrafficSingle wheelSingle wheelSingle wheelMultiple wheel loads and total tonnage
Subgrade propertyNoneSoil typeThreshold strengthResilient modulus and compressive strength
Ballast propertyNoneNoneNoneResilient modulus
Design criteria20 psi allowableAllowable stress by soil classProgressive shearProgressive shear and cumulative deformation
Stress modelEmpiricalHomogeneousHomogeneousMultilayer

For heavy-haul mainline work on soft subgrade, the Li–Selig method (which checks both progressive shear and cumulative plastic deformation over the design tonnage) is the most defensible of the four; the Talbot result can be shown alongside it for comparison with client standards.

Source: Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis

UIC subgrade quality classes and the formation layer

UIC Code 719R classes the subgrade by its expected behavior: S3 good (low settlement, very good support), S2 medium, S1 poor (large settlement), and S0 very poor, plus R for sound rock, which later UIC editions fold into S3. The class follows from fines content, plasticity, Los Angeles value for rock, and whether hydrogeological conditions are good or bad.

Table 2-11. UIC classification of subgrade quality (after UIC 719R)
Soil or rock descriptionHydrogeological conditionsSubgrade class
Rock of very good quality–R
Well-graded soils with < 5% fines; hard rock with LA < 30–S3
Soils with 5–15% fines; sand with < 5% fines; moderately hard rock (30 < LA < 40)good / badS3 / S2
Soils with 15–40% fines; rock moderately susceptible to weathering; soft rock (LA > 40); silty sand and schist with PI > 7good / badS2 / S1
Rock very susceptible to weathering; soils with > 40% fines; slightly plastic silt–S1
Organic soils; soils with > 15% fines at high moisture; soluble soils (rock salt, gypsum); thixotropic soils (quick clay); mixed material / organic; contaminated ground–S0

Fines = particles smaller than 60 µm. Some railways place the mixed/organic soils in S1.

S0 soils settle heavily, are inhomogeneous, change with time and let ballast punch in. Avoid them in alignment where possible or replace them; where neither is possible, especially under high embankments, combine ground improvement with thicker ballast and subballast and a geotextile.

On S1 and S2 subsoil, UIC practice adds a formation layer of better material compacted to 100% Standard Proctor, against the 95% usually specified for embankment subsoil. It only works if the subsoil has a low water content (otherwise fines migrate up and spoil the crossfall) and the layer is homogeneous, without pockets of fine material.

Table 2-12. Required formation-layer thickness, UIC groups 1–4
Subsoil classFormation layer qualityThickness (in.)
S1S212–22
S1S38–16
S2S38–12

Figures · click to zoom

Figure 2-23. Classification of subgrade quality as a function of geotechnical characteristics and hydrogeological conditions (original table). Profillidis Table 9.2, after UIC 719R.
Figure 2-23. Classification of subgrade quality as a function of geotechnical characteristics and hydrogeological conditions (original table). Profillidis Table 9.2, after UIC 719R.
Figure 2-24. Modulus of elasticity and CBR ranges for subgrade classes S0–S3. Profillidis Fig. 9.5.
Figure 2-24. Modulus of elasticity and CBR ranges for subgrade classes S0–S3. Profillidis Fig. 9.5.

After Profillidis (2014), §9.5–9.7, Tables 9.2–9.3, Fig. 9.5; after UIC Code 719R (1994). Full reference under Supplemental Sources.

UIC track-bed thickness formula with a worked example

UIC sizes the total track bed (ballast + subballast) by adding corrections to a base value for subgrade class. The formula comes from the finite-element stress results in Figure 2-14:

e (in.) = N + a + b + c + d + f + g
Table 2-13. Terms of the UIC track-bed thickness formula
TermDepends onValues (in.)
NSubgrade classS1: 27.6 · S2: 21.7 · S3: 17.7
aUIC groupGroups 1–2 or V > 99 mph: 0 · 3–4: −2.0 · 5: −3.9 · 6: −5.9
bTie type and length LTimber (8.5 ft): 0 · concrete: (98.4 − L)/2, with tie length L in inches
cMaintenance volumeMedium: 0 · high, groups 1–5: −3.9 · high, group 6: −2.0
dAxle load22 tons: 0 · 25 tons: +2.0 · 28 tons: +4.7 · 33 tons: +9.8
fSpeedV < 99 mph: 0 · high speed on S3: 0, on S2: +2.0, on S1: +3.9
gGeotextileGeotextile thickness, or 0 if none

Book example. UIC group 4 line, 8.5-ft monoblock concrete ties, S2 subgrade, 22-ton axles, medium maintenance, 124 mph, 0.2-in. geotextile: e = 21.7 − 2.0 − 2.0 + 0 + 0 + 2.0 + 0.2 = 19.9 in. (about 20 in.). With the usual 6-in. subballast, the ballast is 14 in., close to the 15 in. that British practice would give. The same site with a frost index of 540 °F-days needs 31 in. of track bed for frost protection (Figure 2-29), and the larger value governs.

North American check. A 286k car on 4 axles is about 35.7 tons/axle, beyond the formula’s 33-ton calibration point (d = +9.8 in.). Treat the formula as a cross-check on the AREMA/Talbot thickness in this chapter, not as a substitute.

UIC subballast is usually 6 in. of well-graded gravel with Micro-Deval < 15–20 and LA < 20–25 depending on the line’s importance; some railways require at least 30% crushed stone on new lines. Some railways omit subballast and use a thicker formation layer instead.

After Profillidis (2014), §12.1.2, §12.5.1–12.5.5, Eq. 12.8. Full reference under Supplemental Sources.

Sub ballast in practice

Sub ballast is a compacted, well-graded sand–gravel layer 6–12 in. thick between ballast and subgrade. It is often missing on century-old mainline. It drains as part of the lateral path, adds vertical strength, and separates ballast from fine-grained subgrade in both directions. Course specification: crushed or screened pit-run gravel graded 0–3 in. or 0–¾ in., less than 8% fines, no organics, well graded, and ideally at least 50% fractured faces. Watch for contractors offering fill with more fines than specified: it compacts well dry but performs poorly once wet.

Figures · click to zoom

Figure 2-48. Fines pulled from a fouled section: what sub ballast is meant to keep separated.
Figure 2-48. Fines pulled from a fouled section: what sub ballast is meant to keep separated.
Figure 2-49. Fine-fouled ballast at a rail joint.
Figure 2-49. Fine-fouled ballast at a rail joint.

After Geotechnology for Railroaders Program, Module 3, Module 2; Module 3 §08; Module 2 §09. Full reference under Supplemental Sources.

Case study: 2.18.1 Zoning the best subgrade material, and losing it in the stockpile (Look 2023), in §2.18 Case Studies.

2.5 Subgrade Failure Modes
2.5.1 Progressive Shear Failure

Progressive shear occurs when σ_s exceeds the undrained shear strength of the subgrade, typically in saturated fine-grained soils under repeated loading. Manifests as pumping, subgrade mud, and progressive track settlement.

FS against progressive shear:

FS_shear = (π + 2) × s_u / (DLF × σ_s_static) ≥ 3.0 (AREMA Ch. 1 recommendation for cyclic loading)

where s_u = undrained shear strength of subgrade (psf); σ_s_static = static stress at top of subgrade (psf).

Progressive shear (cess heave): signs, monitoring and repair

Mechanism. Repeated overstress at the top of a soft, fine-grained subgrade remolds the soil and squeezes it sideways and upward beside the track. It heaves the cess (the area beside the track) and leaves a depression under the ties. The heave then walls off the side drainage, raises the water table under the track and speeds up the failure. Segmented tubing columns installed through the shoulder show whether the heave is still active.

Massive shear needs much higher stress than progressive failure. It usually happens when strength drops because of water, such as heavy rain or flooding, sometimes with no train present.

What does not work.

  • Dumping ballast into the sag deepens the granular layer locally, but the depression in the subgrade stays and becomes a water trap.
  • A general ballast lift, where clearances allow, adds stability for heavier axles. It does not restore a site that has already failed, because the deformed subgrade surface keeps ponding water.

Repair. Remove the ballast and excavate the failed subgrade to a lower, regular surface sloped to drain. Rebuild with subballast or blanket and clean ballast to the depth from §2.4.2, and restore the side drainage. The two preventive measures are adequate granular depth and drainage that keeps the water table low.

After Selig & Waters (1994), ch. 10. Full reference under Supplemental Sources.

2.5.2 Ballast Pocket Formation

Ballast pockets form when fine-grained subgrade material is pumped upward through ballast voids under dynamic loading. Indicators:

  • Clay smear on ballast particles
  • Rapid track geometry degradation
  • High fouling index (see Section 2.6)
  • Positive mud in standpipe piezometers

Prevention: Properly designed subballast filter layer; maintain drainage; GPR monitoring.

2.5.3 Differential Frost Heave

Ice lens formation in frost-susceptible subgrade causes differential heave across a cross-section or along the track. NSR, CPKC, and CN experience significant frost heave problems.

Differential heave threshold: FRA 49 CFR Part 213 Class 4 surface tolerance = 1.25 in. over 62 ft chord.

Design mitigation:

  • Use non-frost-susceptible blanket layer (USACE FS-0 or FS-1 material) of sufficient thickness to keep the 32°F isotherm above natural subgrade
  • Required blanket thickness determined from modified Berggren equation (see Chapter 18, Section 18.6)

Frost: three conditions, and the subballast fines limit

Frost heave needs freezing temperatures, a supply of water and a frost-susceptible soil, all at once. Remove any one and heave stops. Ice lenses can heave the ground by much more than the roughly 10% volume increase of freezing water alone. On thaw, the released water softens the subgrade and geometry is lost quickly.

How susceptible the soil is depends on its type:

  • Silts are the most susceptible.
  • Clays are next.
  • Clean sands and gravels are not susceptible.

Ballast and subballast insulate the subgrade, and the required thickness is usually set by local experience. Where frost and water reach the subballast, keep its fines below about 5%. On a frost-susceptible embankment over a shallow water table, a geomembrane placed above the water table and below the maximum frost depth can cut off capillary supply (Chapter 17, §17.8.1).

After Selig & Waters (1994), chs. 9 and 12. Full reference under Supplemental Sources.

2.5.4 Subgrade Attrition

Repeated cyclic loading degrades the subgrade surface through abrasion, generating fines that contaminate ballast. Most common in granular subgrades under high-axle-load traffic. Prevent with properly graded subballast and geotextile separator.

Attrition and pumping: diagnose correctly, and do not rely on fabric alone

Where it occurs. Selig and Waters tie subgrade attrition to ballast bearing on hard fine-grained soil (stiff clay) or soft rock (chalk, mudstone, shale) with standing water at the subgrade surface. The ballast grinds the surface into a slurry, and traffic pumps the slurry up to the tie, often at rail joints. The slurry then blocks the drains. This is a narrower setting than the general description above, and it matters when choosing the remedy.

Look-alikes. Ballast and tie wear in wet conditions, and plain dirty ballast, also produce mud at the surface. Before choosing a fix, compare the fines in the slurry with the subgrade, checking plasticity, color and mineralogy.

What fixes it. Two measures together:

  • A sand blanket or subballast that meets the filter criteria in §2.4.1.
  • Drainage that keeps water below the ballast–subgrade interface.

Ballast cleaning alone gives only temporary relief. British Rail made attrition failures rare by blanketing.

The record on geotextiles.

  • In laboratory pumping tests, clay pumped through every geotextile tested, including fabrics sold for this purpose.
  • At Conrail’s Pottstown site (clay-rich mudstone, water at tie bottom), slurry came through the fabric and mud boils reached the surface within 2 years at about 15 MGT per year.
  • At British Rail’s Fenny Compton trial, 2 in. of sand under geotextile and geogrid kept the ballast clean for 3 years. A geotextile plus geomembrane with no sand was the worst performer.

Design point: a sand blanket stops clay pumping, and fabric alone does not.

After Selig & Waters (1994), chs. 10 and 12. Full reference under Supplemental Sources.

Supplemental reference · LEVI Library

The full family of subgrade problems

Sections 2.5.1–2.5.4 cover four subgrade problems; Li et al. recognize ten. Li et al. group them by what drives them — dead load, live (train) load, or the environment — which is a useful way to tie field symptoms back to a cause before selecting a remedy.

Table 2-S6. Characteristics of track subgrade problems (Li et al., 2016, Table 3.9)

CauseTypeContributing factorsField features
Dead loadMassive shear failureWeight of train, track and subgrade; inadequate soil strengthHigh embankments and cut slopes; often triggered by a rise in water content
Dead loadConsolidation settlementEmbankment weight; saturated fine-grained soilsIncreased static stress vs. pre-construction
Live loadSubgrade attritionBallast bearing directly on hard subgrade; clay-rich rock or soil; waterMuddy ballast; missing or inadequate subballast
Live loadCyclic mobility / liquefactionRepeated loading of saturated silt and fine sandLarge displacement; worse with vibration; can occur in subballast
Live loadProgressive shear failureRepeated overstressing of wet fine-grained soilSqueezing at subgrade surface; heave in crib or shoulder; depression under ties
Live loadCumulative plastic deformationRepeated loading of soft or loose soilDifferential settlement; ballast pockets
EnvironmentFrost actionFreezing temperatures, free water, frost-susceptible soilRough surface in winter/spring
EnvironmentSwelling / shrinkageHigh-plasticity soil with changing moistureRough track surface
EnvironmentSlope erosionSurface and subsurface water; windSoil washed or blown away
EnvironmentSoil collapseWater inundation of loose depositsGround settlement

Usman et al. (2015) add a drainage-focused view: most live-load failures on fine-grained subgrade start with water retained in the track section (fouled ballast, blocked ditches, clogged pipe drains), which softens the clay, lowers its strength and bearing capacity, and leads to shear/plastic deformation and ballast pockets. Their cause-and-effect chart (Figure 2-S4) is a practical checklist for tracing a wet spot back to the drainage element that failed. UK surveys cited in the paper found an average of about five wet spots per mile of track.

Source: Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis · Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0)

Supplemental figures · LEVI Library
Progressive shear failure: the subgrade surface is sheared and remolded by cyclic overstress and squeezes outward and upward along the path of least resistance (after Li and Selig).
Supplemental Figure 2-S1. Progressive shear failure: the subgrade surface is sheared and remolded by cyclic overstress and squeezes outward and upward along the path of least resistance (after Li and Selig). Source: Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0), p. 548.
Excessive subgrade plastic deformation forming a ballast pocket that traps water beneath the track.
Supplemental Figure 2-S2. Excessive subgrade plastic deformation forming a ballast pocket that traps water beneath the track. Source: Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0), p. 549.
Wet spot with mud pumping through the ballast &mdash; the typical surface expression of subgrade attrition and fouling.
Supplemental Figure 2-S3. Wet spot with mud pumping through the ballast — the typical surface expression of subgrade attrition and fouling. Source: Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0), p. 549.
Cause-and-effect chart linking flooding, precipitation, fouling and drainage deficiencies to clay subgrade softening and progressive shear / plastic deformation.
Supplemental Figure 2-S4. Cause-and-effect chart linking flooding, precipitation, fouling and drainage deficiencies to clay subgrade softening and progressive shear / plastic deformation. Source: Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0), p. 551.

Cyclic loading: when subgrade plastic strain stops stabilizing

For soils, fatigue shows up as accumulating plastic strain rather than sudden fracture. Repeated-load triaxial tests on clays (Figure 2-25) use R, the ratio of the first-cycle deviator stress to the deviator stress that causes failure. Above R ≈ 0.9, plastic strain increases very rapidly with the number of cycles. Below it, strain grows roughly with log N and levels off. The runaway behavior was observed in S0 and S1 subgrades.

For the effect of traffic on subgrade stress the book uses Dormon’s rule from highway practice: σ1/σ2 = (N2/N1)λ, with λ ≈ 0.2. For two lines with the same axle load, the allowable subgrade stress therefore scales with (T2/T1)0.2: doubling tonnage lowers the allowable stress by about 13%.

Subgrade fines can also migrate upward. Figure 2-26 shows the combinations of plasticity index and liquid limit for which strong infiltration of subgrade fines into a gravel subballast was observed. It is a useful screen when deciding whether a separation geotextile or sand blanket is needed.

Figures · click to zoom

Figure 2-25. Plastic strain εp in clay vs. number of loading cycles N for stress ratios R = 0.67 to 1.03. Profillidis Fig. 9.7.
Figure 2-25. Plastic strain εp in clay vs. number of loading cycles N for stress ratios R = 0.67 to 1.03. Profillidis Fig. 9.7.
Figure 2-26. PI–LL zone in which strong infiltration of subgrade fines into the gravel subballast was observed. Profillidis Fig. 9.19.
Figure 2-26. PI–LL zone in which strong infiltration of subgrade fines into the gravel subballast was observed. Profillidis Fig. 9.19.

After Profillidis (2014), §9.8, §9.10, §9.15.2, Figs. 9.7, 9.19. Full reference under Supplemental Sources.

Frost index and frost-protection thickness

The frost index is the time integral of below-freezing temperature (°F × hours or °F × days). A railway must choose whether to design for the coldest winter or for an average winter and accept occasional frost penetration. Silt is very frost-susceptible, clay is susceptible, and sand and gravel are not.

Table 2-14. Frost index design level and expected exceedance
Frost indexProbability of freezing throughExpected number of underratings
F250%1 in a 2-year period
F520%1 in a 5-year period
F1010%1 in a 10-year period
F1001%1 in a 100-year period

The required frost-protection layer under 14 in. of ballast increases with frost index and depends on the material (gravel needs the most, peat/bark the least; Figure 2-27). A foam-plastic insulation board 2–4 in. thick sharply reduces the required thickness (Figure 2-28). On existing track, frost protection is normally installed at renewal using one of four details: a gravel or cinder layer, stone with a peat filter, foam plastic, or insulation over a frost-storage bottom layer.

Figures · click to zoom

Figure 2-27. Thickness of frost-protection layer under 14 in. of ballast vs. frost index, for gravel, cinders and peat/bark. Profillidis Fig. 9.8.
Figure 2-27. Thickness of frost-protection layer under 14 in. of ballast vs. frost index, for gravel, cinders and peat/bark. Profillidis Fig. 9.8.
Figure 2-28. Thickness of frost-protection layer under 10 in. of ballast with 50- or 4-in. foam-plastic insulation. Profillidis Fig. 9.9.
Figure 2-28. Thickness of frost-protection layer under 10 in. of ballast with 50- or 4-in. foam-plastic insulation. Profillidis Fig. 9.9.
Figure 2-29. Ballast + subballast thickness required to keep frost out of the subgrade vs. frost index and mean annual temperature. Profillidis Fig. 12.6.
Figure 2-29. Ballast + subballast thickness required to keep frost out of the subgrade vs. frost index and mean annual temperature. Profillidis Fig. 12.6.
Figure 2-30. Frost protection on existing track: gravel or cinder layer (min. 31 in., 13 ft wide). Profillidis Fig. 9.10.
Figure 2-30. Frost protection on existing track: gravel or cinder layer (min. 31 in., 13 ft wide). Profillidis Fig. 9.10.
Figure 2-31. Frost protection with foam plastic. Profillidis Fig. 9.12.
Figure 2-31. Frost protection with foam plastic. Profillidis Fig. 9.12.
Figure 2-32. Insulation combined with a drainage layer and frost-storage bottom layer. Profillidis Fig. 9.13.
Figure 2-32. Insulation combined with a drainage layer and frost-storage bottom layer. Profillidis Fig. 9.13.

After Profillidis (2014), §9.11, §12.5.2, Table 9.6, Figs. 9.8–9.13, 12.6. Full reference under Supplemental Sources.

Mud spots, cavities and silt pumping: diagnosing what is below

Before touching a mud spot, ask what kind it is and how deep the problem goes. The cause is usually ballast degradation, subgrade liquefaction and pumping, plastic deformation, subgrade failure, or poor drainage. The fix ranges from tamping (temporary) to undercutting or reinforcing the subgrade (durable). One railroad spent nearly $10M in a year on mud spots and wasted about 90% of it treating symptoms. On another system, over 95% of a $200M+/year ballast budget went into the upper 20 in. of the structure.

On a steep embankment, uncorrected ballast pockets can become a slope failure. In one silt-pumping case, an investigation trench beside sinking track showed silt rising as the track went down. The fix was filter cloth, gravel backfill and deeper ditches, which addressed the water path rather than the sinking.

Figures · click to zoom

Figure 2-50. A mud hole is a substructure symptom; the cause lies below.
Figure 2-50. A mud hole is a substructure symptom; the cause lies below.
Figure 2-51. Subgrade deformation beneath track.
Figure 2-51. Subgrade deformation beneath track.
Figure 2-52. A mud “volcano”: subgrade pumping, common in cuts and high-water-table areas.
Figure 2-52. A mud “volcano”: subgrade pumping, common in cuts and high-water-table areas.
Figure 2-53. Investigation trench with silt rising as the track sank.
Figure 2-53. Investigation trench with silt rising as the track sank.
Figure 2-54. Excavation showing a mud-spot failure zone far larger than the surface symptom.
Figure 2-54. Excavation showing a mud-spot failure zone far larger than the surface symptom.
Figure 2-55. A subgrade cavity, invisible until it fails.
Figure 2-55. A subgrade cavity, invisible until it fails.

After Geotechnology for Railroaders Program, Module 3; §02, §09, §11. Full reference under Supplemental Sources.

Frost heave and spring silt liquefaction: field mechanism and remedies

Frost heave needs five conditions at once: saturated soil, frost-susceptible soil (silt), sub-zero temperature, a slowly advancing freezing front, and a water supply from below. Remove any one and it cannot occur. About 75% of heave problems trace to poorly maintained ditches and about 25% to poor ballast drainage (ballast pockets), even on high fills. In spring, ice lenses can push the rail up several inches over 10–40 ft of track, usually by different amounts on each rail. Shimming is reactive; treat the cause.

Marking and salting is the most practical remedy once drainage alone is not enough. Mark the start and end of the heave tie by tie in spring, then salt in the fall; salting earlier lets rain carry the salt too deep. Provide a transition between salted and unsalted ground so a depression does not form. Other options are drainage and subdrainage, shimming, excavating and replacing silty soil, insulation and injection.

Spring silt liquefaction happens when the thawed top of a silt layer is squeezed by traffic against still-frozen ground below. Pore pressure cannot drain down, so it fractures upward and carries silt onto the shoulder. In one case cross-level moved 3–4 in. under a train. The condition clears once the frost is out. A lateral trench drain speeds recovery:

  • excavate at the point of bulging silt, down to the soft silt at the frost front, and drain any water pocket;
  • place nonwoven geotextile in direct contact with the silt;
  • backfill with free-draining angular stone compacted in lifts, which acts as a shear key; wrap the fabric over the trench about 2 ft below base of rail; finish with clean ballast sloped to a clean ditch;
  • space trenches about 15–20 ft along the weak zone; use a vacuum truck where cables are buried; record locations, since trenches may need redoing in 2–6 years.

Figures · click to zoom

Figure 2-56. Capillary water rising to the frost front, freezing into ice lenses and pushing the ground up.
Figure 2-56. Capillary water rising to the frost front, freezing into ice lenses and pushing the ground up.
Figure 2-57. End of winter: a series of ice lenses at the base of the embankment.
Figure 2-57. End of winter: a series of ice lenses at the base of the embankment.
Figure 2-58. Spring: rail pushed up several inches over a 10–40 ft stretch.
Figure 2-58. Spring: rail pushed up several inches over a 10–40 ft stretch.
Figure 2-59. A water-filled ballast pocket, the source of about 25% of frost heaves.
Figure 2-59. A water-filled ballast pocket, the source of about 25% of frost heaves.
Figure 2-60. Spring silt liquefaction: pale wet silt pushed up through the ballast.
Figure 2-60. Spring silt liquefaction: pale wet silt pushed up through the ballast.
Figure 2-61. Lateral trench excavated to the soft silt at the frost front.
Figure 2-61. Lateral trench excavated to the soft silt at the frost front.
Figure 2-62. Geotextile wrapped over the trench before the final ballast layer.
Figure 2-62. Geotextile wrapped over the trench before the final ballast layer.
Figure 2-63. Salting completed: typically good for several years.
Figure 2-63. Salting completed: typically good for several years.

After Geotechnology for Railroaders Program, Module 6.6; §02–05. Full reference under Supplemental Sources.

Subgrade stability first, and a screening bearing check for light-density track

If the subgrade is not stable, the track will not hold alignment, surface or cross level, however much maintenance is spent on it. Settle the subgrade before the track section. Investigate the alignment (Chapter 5). Design cuts, fills and subgrade preparation to AREMA Chapter 1, Part 2. Confirm soil suitability against the AREMA table of soil types and their suitability as railroad subgrade.

For cohesive subgrades, UFC 4-860-01FA sets the design bearing capacity of the track structure from the unconfined compressive strength, qu, measured at natural water content:

Table 2-S9. UFC design bearing capacity for cohesive subgrade
Annual trafficDesign bearing capacityApproximate equivalent
Less than 5 MGTqu2 su
5 MGT or more0.8 qu1.6 su

Use as a screening check only. The UFC rule was written for low-tonnage installation track. The progressive-shear check in §2.5.1 (FS ≥ 3 on (π + 2) su) allows a stress of about 1.7 su divided by the dynamic load factor, so the UFC rule is less conservative. Use it to screen industry, yard and light-density branch-line track. For mainline and heavy-haul track, design to §2.5.1 and the granular layer methods in §2.4.

Chemical stabilization in frost areas. Use lime or cement stabilized subgrade under track with caution in seasonal-frost areas, and only after laboratory testing that includes frost susceptibility and freeze–thaw durability (Chapter 17, §17.7).

After UFC 4-860-01FA (2004), ch. 6, §8. Comparison with §2.5.1 added by Benesch. Full reference under Supplemental Sources.

2.6 Track Modulus

Track modulus (u) characterizes the stiffness of the combined track-subgrade system. It relates rail deflection to applied load:

u = P / (y × l_w) (lb/ft²)

In practice, track modulus is expressed as:

u = P_w / w_max (lb/ft of rail per in. of deflection)

where:

  • P_w = wheel load (lb)
  • w_max = maximum rail deflection under wheel load (in.)

Typical track modulus values:

Table 2-4. Typical Track Modulus by Condition
Conditionu (lb/in./in.)Equivalent (psi)
Soft subgrade, worn ballast1,000–2,0007–14
Average track, mixed subgrade2,000–4,00014–28
Good track, granular subgrade4,000–6,00028–42
High-quality concrete tie, stiff subgrade6,000–8,00042–56
Amtrak NEC high-speed standard> 8,000> 56

Track modulus directly affects bending moment and deflection in the rail. The characteristic length:

l = (4EI / u)^(1/4) (in.)

where:

  • E = rail elastic modulus = 30 × 10⁶ psi
  • I = rail moment of inertia (in.⁴); 136 RE rail: I = 95.0 in.⁴; 141 RE: I = 103.1 in.⁴
  • u = track modulus (psi)

The maximum rail bending moment:

M_max = P_w × l / 4 (in.·lb)

Higher track modulus reduces deflection but increases dynamic impact forces. All Class I railroads target u ≥ 3,000 psi for 286K heavy-axle freight. Amtrak targets u ≥ 6,000 psi on the NEC.

Supplemental reference · LEVI Library

Measuring trackbed stiffness in the field

McHenry and Rose (2012) reviewed the in-situ tests available for railroad subgrade. Beyond borings and CPT, the options most relevant to track modulus are:

  • Dynamic cone penetrometer (DCP) and PANDA — hand-driven cones that locate ballast/subballast/subgrade interfaces and give a strength profile from the shoulder or crib. The PANDA records blow energy and penetration electronically.
  • Falling weight / light weight deflectometer (FWD, LWD; ASTM D4694) — drop a known weight and back-calculate a layer modulus (EFWD = 0.24P / (dr·r)). Widely used on highway subgrade; LWD is increasingly used on new rail formations in Europe and Asia.
  • Seismic CPT — adds shear-wave velocity, giving a small-strain modulus that better matches the small cyclic strains under train loading than a resilient modulus does.
  • Rail-bound stiffness vehicles — the TTCI Track Loading Vehicle (Pueblo, CO), the Chinese Academy of Railway Sciences two-car system, the University of Nebraska laser deflection system, and the French Portancemètre measure track stiffness continuously. Their output is the best way to pick boring locations on long corridors.

Source: McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of Kentucky

Reaction coefficients, ballast thickness and the stiffness balance

Profillidis expresses stiffness as a reaction coefficient ρ = load / settlement at the level considered (56 kip/in. per t/mm in the source). Typical component values are: rail 280,000–560,000 kip/in.; timber tie 50–80; concrete tie 1,200–1,500; ballast 10–30; rubber pad 560–1,120 kip/in.. The subgrade is the softest element in the chain:

Table 2-15. Subgrade reaction coefficients
Subgradeρ (kip/in.)
Silty28–84
Clay84–112
Gravel or rock112–450
Frozen450–560

Existing track with ballast only (no subballast): total ρ = 8.4–56 kip/in., average 17 kip/in.. Bridges: 560–840 kip/in..

Table 2-16. Effect of ballast thickness e on subgrade stress and track stiffness (Boussinesq, multilayer elastic)
e (in.)068121620
λ (subgrade stress ratio)10.700.500.350.250.20
ρ / ρ011.402.002.854.005.00

Design should satisfy two principles: stresses reaching the subgrade must stay below failure values, and the track must remain flexible. A rock subgrade is more than three times as stiff as a clay subgrade, so even rock cuts need a full ballast and subballast section. In the finite-element breakdown (Figure 2-34), the subgrade supplies about 40–43% of total track elasticity, the track bed 20–22% and the rail pads 25–34%.

Figures · click to zoom

Figure 2-33. Elastic line (deflected shape) of a timber tie on rock and on S3, S2 and S1 subgrades under two 11-ton loads. Profillidis Fig. 8.12.
Figure 2-33. Elastic line (deflected shape) of a timber tie on rock and on S3, S2 and S1 subgrades under two 11-ton loads. Profillidis Fig. 8.12.
Figure 2-34. Contribution of each component to total track elasticity, timber vs. concrete ties. Profillidis Fig. 8.16.
Figure 2-34. Contribution of each component to total track elasticity, timber vs. concrete ties. Profillidis Fig. 8.16.

After Profillidis (2014), §8.2.2–8.2.3, §8.4.9, §8.8, Table 8.1, Figs. 8.12, 8.16. Full reference under Supplemental Sources.

Measuring track modulus: method, slack and nonlinearity

Track modulus lumps the fastenings, ties, ballast, subballast and subgrade into one spring. It cannot be calculated from the components. It has to be measured. Selig and Waters describe three methods:

  • Single point load (preferred). Measure the maximum rail deflection under one load: u = [P / (2 ymax)]4/3 / (64 EI)1/3.
  • Deflection basin (Talbot). The load equals u times the area of the deflection basin. This averages over a length of track.
  • Multi-axle vehicle. Convenient, but it relies on superposition.

Remove slack. With all three methods, use the difference between a light seating load and a heavy load. This removes gaps and slack under the ties. Load–deflection curves are strongly nonlinear, and more so as track settles, so always report the load levels with the modulus.

Field values and correlation. At eight U.S. sites, u ranged from 2,200 to 7,000 psi. CPT soundings to at least 16 ft below the tie, back-analyzed with a multilayer model, gave a subgrade resilient modulus of about Er ≈ 14 qc for all the data, or about 21 qc with outliers removed. This makes CPT a practical way to estimate track stiffness along a corridor.

Sensitivity. In the model, fastener stiffness had the largest effect on u, but it varies little in real track (about 10%). Ballast modulus, ballast depth, tie spacing and rail section each changed u by 10–20%. The subgrade remains the most influential variable in the field.

After Selig & Waters (1994), chs. 5 and 10. Full reference under Supplemental Sources.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-18 Shear-wave velocity from CPT VₛUse: Young, uncemented Holocene–Pleistocene soils. Limits: Underpredicts Vs in aged or cemented soils. Measure Vs directly for seismic site class.
  • RK-10 UCS from point load index σ꜀Use: Hard, isotropic rock; quick strength index in field. Limits: K varies widely with rock type and anisotropy; calibrate with lab UCS. Unreliable in weak rock (σc < ~25 MPa).
2.7 Ballast Fouling Index

Ballast fouling reduces drainage capacity and increases subgrade stress. The Fouling Index (FI) quantifies fouling:

FI = P₄ + P₂₀₀

where:

  • P₄ = percent passing No. 4 sieve (%)
  • P₂₀₀ = percent passing No. 200 sieve (%)
Table 2-5. Ballast Fouling Classification (AREMA Ch. 1)
FI ValueFouling ConditionRecommended Action
< 1CleanNo action; monitor
1–10Slightly fouledMonitor; plan maintenance
10–20Moderately fouledSchedule ballast cleaning
20–40FouledImmediate ballast cleaning
> 40Highly fouledBallast undercutting; possible subgrade work

All Class I railroads track fouling condition through periodic ballast sampling programs. BNSF and UPRR Engineering Instructions require fouling index data to be included in geotechnical reports for mainline rehabilitation projects. GPR can estimate fouling condition non-destructively (Section 2.9).

Supplemental reference · LEVI Library

Where the fouling actually comes from

Selig and Waters (1994) examined the source of fouling material at a large set of sites. Breakdown of the ballast itself was the major source at 76% of sites; upward migration from an underlying granular layer (usually old roadbed mixed in at the interface) was the major source at 13%. Contamination pumped up from the subgrade was rare. Li et al. point out that muddy ballast is often wrongly blamed on subgrade pumping when it is really ballast abraded under traffic in the presence of water — which changes the remedy from subgrade treatment to ballast renewal and drainage.

Field-friendly fouling criteria

The Selig fouling index depends on the percent passing the No. 200 sieve, which is hard to measure reliably in the field. Canadian National uses the percent passing the ¾-in. sieve instead; Sussmann et al. (2012) matched the two scales:

Table 2-S4. Selig & Waters fouling index vs. CN ¾-in. sieve criterion

CategoryFouling index (Selig & Waters)% passing ¾ in. (CN)
Clean< 1–
Moderately clean1 to < 10< 25
Moderately fouled10 to < 2025–40
Fouled20 to < 4040–50
Highly fouled> 40> 50

Table 2-S5. Ballast cleaning intervention limits used by different agencies

Agency / sourceCriterionLimitBasis
Selig & WatersFouling index40 / 30Highly fouled / drainage reduction
SpoornetFISpoornet = 0.4P19 + 0.3P6.7 + 0.2P1.18 + 0.1P0.1580Gradation change
Canadian National% passing ¾ in. (¾ in.)40%Highly fouled
UIC% passing ½ in. (½ in.)30%–
ERRI% passing ⅞ in. (⅞ in.)30%–

For field sampling programs, the single-sieve CN criterion lets the crew classify a sample at the tie end without shipping it to the lab; reserve full gradations (and FI) for representative samples and design stations.

Source: Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis

Ballast cleaning trigger, renewal cycle and reuse

  • Cleaning trigger: ballast cleaning machines are used when grains smaller than 0.87 in. make up more than 30% of the ballast volume. The cleaner removes all stone smaller than 1.4 in. to a depth of 10 in. below the tie, at about 1,300 ft of track per hour.
  • Cycles on main lines: tamping every 3–5 years; ballast replacement every 15–30 years depending on stone strength and traffic (15–20 years on high-speed lines, against about 50 years for concrete ties and rail). Ballast stone tolerates only a limited number of tamping cycles.
  • Longer life: harder stone, a wider ballast section and more uniform compaction lengthened the Swiss tamping interval from 4 to 7 years and cut maintenance cost by 40% over 10 years.
  • Reuse: fouled ballast removed from track weighs about 106 pcf against 94 pcf new. If strength remains, washed spent ballast can be reused as subballast or formation layer on secondary lines, or as ballast on lines under 87 mph after treatment. France removes about 1 million tons per year this way; disposal costs (up to €60/t) often make reuse economic.
  • Vegetation contaminates ballast with debris that blocks drainage, accelerates tie decay by root expansion and hides defects from visual inspection.

Figures · click to zoom

Figure 2-35. Ballast profiling machine restoring the shoulder section. Profillidis Fig. 16.10.
Figure 2-35. Ballast profiling machine restoring the shoulder section. Profillidis Fig. 16.10.
Figure 2-36. Track zones for vegetation control: inter-track (A), ballast (B), shoulder (C1, C2), walkway (D1, D2), slope (E), drainage channel (F). Profillidis Fig. 9.21.
Figure 2-36. Track zones for vegetation control: inter-track (A), ballast (B), shoulder (C1, C2), walkway (D1, D2), slope (E), drainage channel (F). Profillidis Fig. 9.21.

After Profillidis (2014), §12.7, §16.8–16.9, §16.12, §9.16, Figs. 9.21, 16.10. Full reference under Supplemental Sources.

Fouling sources, the failure zone, and choosing a repair

Fouling comes mainly from particle breakdown under traffic, plus abraded tie material, spilled lading (coal, grain), wind-blown sand and silt, slurry pumped up from the subgrade, chemical weathering, and maintenance tools (tamping accelerates breakdown). Gradation testing shows a failure zone. Once material finer than ¾ in. passes about 25% (the ideal point to undercut) and heads toward 40% (action mandatory), degradation accelerates sharply, typically within 500 MGT. Ballast next to an active mud spot is usually near its own failure zone. Visual inspection is not enough; use sieve analysis or GPR.

Table 2-19. Ballast repair options when ballast is fouled
MethodCost / durationResult
TampingLow cost, very short termLow efficiency: “tamping mud”
Skin liftLow short-term costOut of the mud temporarily
Major liftMediumLonger term, but the problem may return
Shoulder cleaningMediumBetter if ballast is not too fouled; can extend ballast life
Full-depth undercuttingHighGreatest gain in internal drainage and bearing; about 15 years at 50 MGT/year

Undercut to about 12 in. below the ties, with the bar inclined to leave a 2% slope that drains to ditches or shoulders. Plan depths so every track drains on multiple-track territory, and place waste where it neither blocks drainage nor loads the shoulder. Undercutting without restoring lateral drainage gives minimal benefit. Watch for buried fiber. A documented move from reactive to planned ballast management cut ballast-related slow orders from over 600 to under 20 per year, ballast derailments from about 8 to about 0, and spending from over $250M to under $100M per year.

Figures · click to zoom

Figure 2-64. Fouled ballast: fines filling the voids that should drain water.
Figure 2-64. Fouled ballast: fines filling the voids that should drain water.
Figure 2-65. A failed area: new ballast on top, almost none functionally present beneath.
Figure 2-65. A failed area: new ballast on top, almost none functionally present beneath.
Figure 2-66. Full undercutter in operation.
Figure 2-66. Full undercutter in operation.
Figure 2-67. Twelve inches of clean ballast beneath the ties, correctly profiled.
Figure 2-67. Twelve inches of clean ballast beneath the ties, correctly profiled.
Figure 2-68. Ballast problems under reactive maintenance.
Figure 2-68. Ballast problems under reactive maintenance.
Figure 2-69. The same metrics after criteria-based planned maintenance.
Figure 2-69. The same metrics after criteria-based planned maintenance.

After Geotechnology for Railroaders Program, Module 3; §06–07, §13. Full reference under Supplemental Sources.

What fouling does to drainage and settlement, and how to limit it

Table 2-SW4. Ballast hydraulic conductivity by fouling index (after Parsons)
ConditionFouling indexkh, in./skh, mm/s
Clean< 11–225–50
Moderately clean1–90.1–12.5–25
Moderately fouled10–190.06–0.11.5–2.5
Fouled20–390.0002–0.060.005–1.5
Highly fouled≥ 40< 0.0002< 0.005

Settlement. In box tests, settlement increased with fouling index. A small gap under the tie (0.039–0.16 in. of lift-off between loads) increased settlement by about an order of magnitude and accelerated both fouling and tie wear. Highly fouled ballast that settles quickly after tamping is a sign that it needs cleaning.

Sources vary by railway. British Rail attributed its fouling as follows:

  • External sources (spillage, airborne): 52%.
  • Attrition: 21%.
  • Tamping: 20%.
  • Delivered with the ballast: 7%.

North American sites were dominated by ballast breakdown (see above). Sample before assuming the source. In BR tests, 20 tamping insertions broke 15–45% of the 1½–2-in. particles, and each tamp produced 4–9 lb of material finer than ½ in.

Not all fines are equal. Sand and gravel fouling is tolerable. Silt forms an abrasive slurry. Clay fouling may require 100% ballast replacement.

Six ways to limit fouling:

  • Deliver ballast clean.
  • Limit spillage from cars.
  • Tamp only when geometry requires it.
  • Specify attrition-resistant stone.
  • Keep the ballast drained.
  • Provide a blanket over fine-grained subgrade.

Undercut or clean at a fouling index of about 40 if the ballast is cleanable. Plow or sled it out if it is fouled with wet, plastic fines.

After Selig & Waters (1994), chs. 8, 13 and 16. Full reference under Supplemental Sources.

2.8 Subgrade Drainage Design

Poor drainage is the single most common root cause of subgrade problems in North American railroad practice. The geotechnical consultant is responsible for assessing existing drainage adequacy and designing improvements.

Reference graphics · click to zoom

Road Drainage Fundamentals
Road Drainage Fundamentals
2.8.1 Drainage Design Criteria

Required drainage capacity:

Q = C × i × A (ft³/s) [Rational Method]

where:

  • C = runoff coefficient (0.6–0.9 for ballasted track)
  • i = design rainfall intensity (in./hr; use 2-year, 24-hour event for typical track; 10-year for mainline per CSXT Eng. Std.)
  • A = drainage catchment area (acres)

Subgrade drainage outlet spacing:

For a track grade of g (ft/ft) and allowable ponding width w (ft):

L_outlet = (w × k_subballast) / (i_net) (ft)

where k_subballast = lateral permeability (ft/day); i_net = net lateral hydraulic gradient.

In practice, AREMA Chapter 1 recommends longitudinal drainage outlets every 300–500 ft for typical mainline conditions; 150–200 ft for sag vertical curves.

2.8.2 Edge Drain Design

Perforated pipe edge drains at the base of the subballast layer are required for all new mainline construction by CSXT, NSR, UPRR, BNSF, and CN engineering standards. Design:

Pipe diameter: 4 in. minimum perforated HDPE; 6 in. for grades < 0.5%

Filter requirements: Geotextile wrapping per AREMA Chapter 1 AOS requirements:

AOS ≤ D₈₅(subballast) (no piping)

k_geotextile ≥ 10 × k_subballast (adequate flow)

Reference graphics

Culverts
Culverts
Anatomy of a Modern Road — Layers, Geogrid & Subdrainage
Anatomy of a Modern Road — Layers, Geogrid & Subdrainage

Groundwater depth, crossfall and geotextile filters

UIC guidance is that the groundwater level should be at least 2.6 ft below the top of subgrade. Where it is not, it must be lowered with ditches or deep drains. Individual railways set their own minimum depths below rail or formation (Figure 2-37). Even where groundwater is deep enough, hydrogeological conditions are not rated “good” unless drainage devices are provided and the top of subgrade has a 3–5% crossfall. Sites with large seasonal groundwater fluctuation need a separate study, where a sand filter or geotextile may be warranted.

Geotextiles (polypropylene or polyester, 0.016–0.12 in. thick, woven or non-woven) separate, reinforce, filter and drain. They go under the subballast, never directly under the ballast. They do not replace ballast or subballast for load spreading: railways that laid a geotextile and also cut ballast thickness or omitted subballast saw the ballast puncture the fabric and lost the crossfall. A finite-element study found about a 10% reduction in stress at the top of subgrade from the geotextile. Filter permeability criteria quoted by the book:

non-cohesive soils: kg ≥ tg·ks / (5·d50)     cohesive soils: kg > 100·ks

where kg = geotextile permeability (ft/day), tg = geotextile thickness (in.), ks = soil permeability (ft/day) and d50 = soil 50% passing size (in.).

Figures · click to zoom

Figure 2-37. Minimum depth of groundwater below a reference level for “good” hydrogeological conditions, by railway (DB, SBB, SJ, VR, NSB, OBB, SNCF, BR). Profillidis Fig. 9.3.
Figure 2-37. Minimum depth of groundwater below a reference level for “good” hydrogeological conditions, by railway (DB, SBB, SJ, VR, NSB, OBB, SNCF, BR). Profillidis Fig. 9.3.
Figure 2-38. Drainage devices along the railway subgrade: crossfall to side drains, base drainage. Profillidis Fig. 9.4.
Figure 2-38. Drainage devices along the railway subgrade: crossfall to side drains, base drainage. Profillidis Fig. 9.4.
Figure 2-39. Finite-element mesh used to assess the reinforcing effect of a geotextile under a track bed. Profillidis Fig. 9.20.
Figure 2-39. Finite-element mesh used to assess the reinforcing effect of a geotextile under a track bed. Profillidis Fig. 9.20.

After Profillidis (2014), §9.4, §9.14.1, §9.15, Eqs. 9.13–9.14, Figs. 9.3, 9.4, 9.20. Full reference under Supplemental Sources.

Internal drainage on multiple tracks, and why it blocks

On double track, each track drains laterally away from the centerline. On three or more tracks, the outside tracks drain outward and the inner tracks drain into longitudinal trench drains, with the subgrade and sub-ballast surfaces sloped to suit. Ballast-deck bridges need their own designed drainage. Lateral drainage blocks when there is no cross-slope, when ballast pockets have formed, or when material and vegetation build up between the ballast toe and the ditch. Water trapped in the ballast is the leading cause of mud-fouled ballast. Groundwater seepage, where the subgrade sits at or below a fluctuating water table, is the second.

  • Move water away from below the ties as quickly as possible.
  • Keep ballast and shoulders clean and permeable.
  • Keep the subgrade dry; drain ballast water pockets.
  • Do not let water pond in ditches, especially in side-hill cuts.

Figures · click to zoom

Figure 2-70. Double track: each track drains away from the centerline.
Figure 2-70. Double track: each track drains away from the centerline.
Figure 2-71. Three or more tracks: inner tracks drain to longitudinal trench drains.
Figure 2-71. Three or more tracks: inner tracks drain to longitudinal trench drains.
Figure 2-72. Blocked lateral drainage: no cross-slope, ballast pockets, or buildup at the toe.
Figure 2-72. Blocked lateral drainage: no cross-slope, ballast pockets, or buildup at the toe.
Figure 2-73. Water trapped in the ballast layer.
Figure 2-73. Water trapped in the ballast layer.

After Geotechnology for Railroaders Program, Module 4; §03, §05–06. Full reference under Supplemental Sources.

Can the ballast section drain the design storm?

Three requirements. Track drainage works only if all three are met:

  • The ballast is clean enough to pass water as fast as it enters.
  • The subballast and subgrade surfaces slope to the sides.
  • An outlet carries the water away. A section with no outlet is a bathtub.

Size the system for the highest inflow expected over its design life, not the average.

The center of the track ponds first. On a low-permeability subgrade, water flows mostly sideways. About two-thirds of it leaves through the shoulders. The zone within about 12 in. of the track centerline has the longest flow path and saturates first, so it sets the critical rainfall rate.

Table 2-SW5 gives the critical rainfall rate for several ballast conditions. The cases assume 12 in. of ballast below the tie and 6 in. of silty-sand subballast on an impermeable subgrade.

Table 2-SW5. Rainfall rate that saturates the center of the track section (Parsons cases)
Ballast conditionCritical rate, in./hr
Clean5.9
Clean shoulders; fouled (FI 30) below1.4
Undercut, over FI 30 ballast0.33
Undercut, over FI 40 ballast0.31
Fouled throughout (FI 30)0.06
Clean shoulders; highly fouled (FI 40) below0.02
Highly fouled throughout (FI 40)0.001

Double track that drains to one side only has about half these critical rates.

How to use it.

  • Compare the critical rate with the design rainfall intensity over the planned cleaning cycle to set an allowable fouling index.
  • For moderately fouled track, shoulder cleaning beats undercutting.
  • For highly fouled track, undercutting is better, because water under the center would otherwise have to pass through fouled ballast to reach the cleaned shoulders.
  • Full cleaning is best.

After Selig & Waters (1994), ch. 13. Full reference under Supplemental Sources.

Case study: 2.18.2 Rail formation on broken hard rock: ruts after a week, tests all passed (Look 2023), in §2.18 Case Studies.

2.9 Ground-Penetrating Radar (GPR) for Ballast Assessment

GPR is an efficient, non-destructive tool for mapping ballast fouling, subballast thickness, and subgrade moisture conditions along track. It is standard practice for mainline rehabilitation investigations at CSXT, NSR, UPRR, BNSF, and CN.

2.9.1 GPR Method Overview

GPR uses an antenna (typically 400 MHz or 1 GHz) mounted on a hi-rail vehicle to transmit and receive electromagnetic pulses through the track structure. Reflections at material boundaries provide:

  • Ballast/subballast interface depth
  • Subballast/subgrade interface depth
  • Areas of fouled or wet ballast (lower dielectric constant contrast)
  • Subgrade anomalies (mud pockets, voids, wet zones)

Reference graphics

Ground Penetrating Radar
Ground Penetrating Radar
2.9.2 GPR Interpretation — Dielectric Constant

The depth to a reflector:

d_GPR = (v × t_twtt) / 2 (ft)

where:

  • v = electromagnetic wave velocity in ballast (ft/ns); v = c / √ε_r
  • c = speed of light = 0.984 ft/ns
  • ε_r = relative dielectric constant of ballast (clean granite ballast: ε_r ≈ 5–6; fouled/wet ballast: ε_r ≈ 10–30)
  • t_twtt = two-way travel time (ns) from radar trace
Table 2-6. GPR Dielectric Constants for Track Materials
Materialε_rWave Velocity (ft/ns)
Clean granite ballast5–60.402–0.440
Moderately fouled ballast8–120.284–0.348
Highly fouled/saturated15–300.180–0.254
Subballast (granular, dry)6–90.328–0.402
Clay subgrade (moist)20–400.156–0.220
Ballast voids/air10.984
2.9.3 GPR Deliverables

Standard GPR deliverables for railroad geotechnical investigations:

  • Continuous color-coded fouling index map along alignment (1 ft spatial resolution)
  • Ballast depth profiles (both rails and center)
  • Subballast thickness profile
  • Anomaly log (GPS-referenced stations flagging mud pockets, thin layers, wet zones)
  • Correlation borings recommended at anomaly stations (typically 1 boring per 5 anomaly locations)

CSXT Engineering Standards Section 6 and BNSF Engineering Instructions both require GPR survey results to be correlated with at least 10% field-verified boring data before design recommendations are finalized.

Supplemental reference · LEVI Library

What controls the GPR signal in ballast

Leng and Al-Qadi measured the dielectric constant of granite and limestone ballast in a 36-in.-deep test box using 2-GHz air-coupled antennas (the same setup used on the BNSF Orin Subdivision validation data). Key findings useful when reviewing a GPR vendor’s interpretation:

  • Limestone ballast has a measurably higher dielectric constant than granite at the same fouling level, so the Table 2-6 values should be calibrated to the ballast type on the line rather than assumed.
  • Dielectric constant rises linearly with fouling level (0–50% of void volume) and rises sharply with moisture content — wet fouled ballast is what makes the strongest scattering signal.
  • A time–frequency (short-time Fourier transform) plot of the signal shows fouling as a loss of high-frequency energy with depth, giving an indirect fouling indicator between calibration points.

Source: Leng, Z. and Al-Qadi, I. L. “Railroad Ballast Evaluation Using Ground-Penetrating Radar: Laboratory Investigation and Field Validation.” Transportation Research Record

2.10 Client-Specific Subgrade Requirements
Table 2-7. Track Subgrade Design Requirements by Railroad Client
RailroadMin. Ballast Depth (in.)Min. Subballast (in.)Blanket LayerGPR Required?FI ThresholdGoverning Std.
CSXT12 (tie bottom)6Yes if CBR < 5Mainline rehabFI > 20CSXT Eng. Std. Sec. 6
NSR126Yes if CBR < 5Mainline rehabFI > 20NSR Eng. Std. Sec. 6
G&W106Case-by-caseNot requiredFI > 25G&W Eng. Bulletin
UPRR128Yes if CBR < 4Mainline rehabFI > 20UPRR Eng. Instr. Manual
BNSF128Yes if CBR < 4Mainline rehabFI > 20BNSF Eng. Instructions
CPKC128Yes (frost design)Mainline rehabFI > 20CPKC Track Standards
Amtrak1410Yes if CBR < 6All projectsFI > 15Amtrak Eng. Std.
CN128Yes (frost design)Mainline rehabFI > 20CN Eng. Standards
AREMA Min.106Per designCase-by-caseFI > 20AREMA MRE Ch. 1
2.11 Worked Calculation Examples
Example 2-1: BNSF Wyoming Mainline — Stress at Top of Subgrade

Project context: BNSF Powder River Basin mainline rehabilitation. Track carries unit coal trains at 286K GRL. Existing ballast depth averages 18 in.; subballast is 6 in. Client requests evaluation of subgrade adequacy.

Given:

  • Cooper E-80 wheel load: P_w = 40,000 lb per wheel
  • DLF = 1.4 (BNSF UPRR PRB; higher DLF for heavy tonnage)
  • Ballast thickness: d_b = 18 in. = 1.5 ft
  • Subballast thickness: d_sb = 6 in. = 0.5 ft
  • Total d = 2.0 ft
  • Concrete tie: B_t = 0.917 ft (11 in.), L_t = 8.5 ft
  • θ = 35°, tan(35°) = 0.700

Step 1: Dynamic wheel load

P_d = P_w × DLF = 40,000 × 1.4 = 56,000 lb

Step 2: Effective area at top of subgrade

A_eff = (0.917 + 2 × 2.0 × 0.700) × (8.5 + 2 × 2.0 × 0.700)

= (0.917 + 2.800) × (8.5 + 2.800)

= 3.717 × 11.300 = 42.0 ft²

Step 3: Vertical stress at top of subgrade

σ_s = P_d / A_eff = 56,000 / 42.0 = 1,333 psf = 0.67 tsf

Step 4: Check against subgrade capacity

Field vane shear tests on subgrade soil: s_u = 350 psf (average of 5 VST readings)

σ_allow = (π + 2) × s_u / 3.0 = 5.14 × 350 / 3.0 = 599 psf

FS = σ_allow / σ_s(static) = 599 / (40,000/42.0) = 599 / 952 = 0.63 < 1.0

The subgrade is critically overstressed even without dynamic amplification. Conclusion: Subgrade improvement is required. Minimum required total thickness to reduce σ_s(static) ≤ 599 psf: from Table 2-1, d ≥ 30 in. of ballast + subballast. BNSF standard is 12 in. ballast + 8 in. subballast = 20 in. total, which is insufficient. Recommend 24 in. ballast + 12 in. granular blanket (= 36 in. total), providing σ_s(static) = 400 psf < 599 psf ✓, or evaluate PVD + preloading per Chapter 17.

Example 2-2: CSXT Southeast — Ballast Fouling Assessment

Project context: CSXT Georgia Division mainline at MP 42.3, reported for track geometry deviation. Ballast samples collected at 500-ft intervals over a 2-mile segment.

Given (representative sample at MP 42.3):

  • P₄ (passing No. 4 sieve) = 14.2%
  • P₂₀₀ (passing No. 200 sieve) = 3.8%

Step 1: Fouling Index

FI = P₄ + P₂₀₀ = 14.2 + 3.8 = 18.0

Per Table 2-5: FI = 18.0 → Moderately Fouled. CSXT threshold is FI > 20 for immediate action; this sample is approaching threshold.

Step 2: Assess along-alignment pattern

MPP₄ (%)P₂₀₀ (%)FICondition
42.08.51.29.7Slightly fouled
42.314.23.818.0Moderately fouled
42.622.15.727.8Fouled
42.931.49.240.6Highly fouled
43.218.74.323.0Fouled
43.511.12.613.7Moderately fouled

Conclusion: The segment from MP 42.6 to MP 43.2 (0.6 miles) requires immediate ballast cleaning or undercutting. MP 42.9 (FI = 40.6) is at the threshold for undercutting with subgrade investigation. Recommend advancing 3 borings at MP 42.9 to assess whether ballast pockets have developed.

Step 3: Track modulus check at MP 42.9

At highly fouled locations, track modulus typically drops to < 2,000 psi. CSXT Engineering Standards require minimum u = 3,000 psi for Class 4 mainline. Confirm with deflection measurement (Hy-Rail mounted optical or accelerometer system).

Example 2-3: CN Manitoba — Frost Heave Blanket Design

Project context: CN Prairie North Line through Manitoba clay (Lac du Bonnet till, FS-3 subgrade). Track geometry defects occur each spring. Evaluate adequacy of existing 12-in. ballast + 6-in. subballast and design required blanket layer.

Given:

  • Design freezing index: FI_air = 2,800 °F·days (CN standard for Manitoba)
  • Existing total track section above subgrade: 12 + 6 = 18 in. = 1.5 ft
  • Native subgrade: frost-susceptible till, FS-3 (see Chapter 18, Table 10-6)
  • CN requires 32°F isotherm to remain at or above top of native subgrade

Step 1: Frost penetration in current section (Modified Berggren)

For granular fill above subgrade:

X = λ × √(FI_surface)

Using CN parameters: λ = 1.50 ft/°F·days^0.5 (average for granular fill, from Chapter 18 climate table)

X = 1.50 × √2,800 = 1.50 × 52.9 = 79.4 in. = 6.6 ft

The 32°F isotherm penetrates 6.6 ft below top of ballast. Current non-frost-susceptible layer is only 1.5 ft. The isotherm enters native till at 1.5 ft depth.

Step 2: Required blanket thickness

Required non-frost-susceptible fill to intercept freezing front:

d_blanket ≥ 6.6 ft − 1.5 ft (existing) = 5.1 ft additional blanket layer

This is impractical as a strictly thermal solution. CN Engineering Standards permit use of XPS insulation board (R-10 per inch, min. 2 in. thick) to reduce required fill thickness.

With 2 in. XPS insulation (thermal equivalent to 2.5 ft granular fill):

d_blanket = 6.6 ft − 1.5 ft − 2.5 ft (insulation equivalent) = 2.6 ft granular blanket (31 in.)

Conclusion: Provide 31 in. of FS-0/FS-1 granular blanket + 2 in. XPS insulation board below existing subballast. Verify that final σ_s at top of subgrade (including blanket) satisfies bearing capacity. CN Engineering Standards require frost blanket designs to be submitted with PE seal.

2.12 Representative Data Table
Table 2-8. Track Subgrade Field Data Summary — Mixed Client Projects
StationClientSubgrade USCSs_u (psf)CBRFId_total (in.)σ_s (psf)FS_shearGPR Anomaly
A+00BNSFCH3501.8N/A201,3330.63Mud pocket
B+50CSXTSC6204.218.0249002.09Moderately fouled
C+00NSRML4803.127.8249001.62Fouled zone
D+25CNCL2901.5N/A182,1900.40Wet subgrade
E+75AmtrakSP7508.59.7306603.45Clean
F+00G&WSM9006.813.7249003.03Slightly fouled
G+50CPKCML4202.8N/A182,1900.58Frost lens

Material parameters and typical European cross-sections

Table 2-17. Average mechanical parameters used in UIC finite-element track models
MaterialE (psi)Poisson’s νc (psi)φ (°)
Poor subgrade (S1)1,7800.42.110
Medium subgrade (S2)3,5600.31.420
Good subgrade (S3)11,4000.3035
Rock subgrade (R)427,0000.221020
Ballast18,5000.2045
Gravel subballast28,4000.3035
Sand14,2000.3030

Values converted from kp/cm² by Benesch (1 kp/cm² = 14.22 psi). These are model inputs from UIC test programs, not design values for a specific site.

The cross-sections below show the European layering in practice: 3–5% crossfall on the subballast and subgrade, 2:3 ballast and fill side slopes, and 12 ft track centers to the edge of the formation on a double track with drains and signal/electrification foundations at the shoulder.

Figures · click to zoom

Figure 2-40. Single track with steel ties: ballast, subballast and subgrade with 3–5% crossfall. Profillidis Fig. 12.7.
Figure 2-40. Single track with steel ties: ballast, subballast and subgrade with 3–5% crossfall. Profillidis Fig. 12.7.
Figure 2-41. Double track with monoblock concrete ties (Vmax = 155 mph). Profillidis Fig. 12.9.
Figure 2-41. Double track with monoblock concrete ties (Vmax = 155 mph). Profillidis Fig. 12.9.

After Profillidis (2014), §8.4.6, Table 8.2, §12.6, Figs. 12.7, 12.9. Full reference under Supplemental Sources.

2.13 Figure Placeholders
  • Figure 2-1. Railroad track structure cross-section showing rail, tie, ballast, subballast, blanket, and subgrade layers with AREMA-standard dimensions.
  • Figure 2-2. Talbot stress distribution: effective area A_eff at top of subgrade as a function of total layer thickness d and tie geometry.
  • Figure 2-3. Stress at top of subgrade vs. layer thickness (Table 2-1 data plotted); horizontal line at σ_allow for soft clay example.
  • Figure 2-4. AREMA No. 4 and No. 24 ballast gradation curves (semilogarithmic grain-size plot).
  • Figure 2-5. Ballast Fouling Index distribution map (along-alignment color-coded bar chart, MP 42.0–43.5, CSXT Example 2-2).
  • Figure 2-6. GPR radargram interpretation: annotated field radargram showing ballast/subballast interface, fouled zones, and subgrade anomaly.
  • Figure 2-7. Track modulus u vs. rail deflection under wheel load; effect of ballast fouling on u.
  • Figure 2-8. Frost penetration diagram for CN Example 2-3: temperature profile, 32°F isotherm location, and design blanket thickness.
  • Figure 2-9. Subgrade failure modes illustration: (a) progressive shear, (b) ballast pocket with mud pumping, (c) frost heave, (d) subgrade attrition.
  • Figure 2-10. Edge drain cross-section at base of subballast: perforated pipe, geotextile filter wrap, outlet detail.

Reference graphics

Flexible Pavement Layers — Subgrade to Asphalt
Flexible Pavement Layers — Subgrade to Asphalt
TxDOT Soil Classes C1–C4 for Embankment and Subgrade
TxDOT Soil Classes C1–C4 for Embankment and Subgrade
Geogrid placement on subgrade
Geogrid placement on subgrade
Track Load Transfer
Track Load Transfer
Cone Penetration Test
Cone Penetration Test
2.14 Practical Recommendations
  1. Always compute σ_s before assessing subgrade adequacy. The rail load reaches the subgrade modified by DLF, tie geometry, and layer thickness. Do not use static wheel load alone — it will underestimate subgrade stress by 30–50% on typical Class I track.
  2. Use GPR as a screening tool, not a definitive diagnostic. GPR identifies anomalies efficiently over long distances but cannot replace borings for confirmation. Recommend correlation borings at all GPR anomaly stations before designing subgrade remediation.
  3. Design subballast as a filter, not just a filler. Verify Terzaghi filter criteria between subballast and subgrade. A subballast layer that fails the piping criterion will allow subgrade fines to migrate upward, accelerating fouling regardless of its thickness.
  4. Specify ballast quality by procurement source, not just gradation. Los Angeles abrasion and soundness test results are material-specific. Do not assume that any crusher-run angular stone meets AREMA requirements. Require pre-construction materials testing for all ballast sources and track compliance with client engineering standards.
  5. Address drainage first in all subgrade rehabilitation designs. A high fouling index in a well-drained section is a maintenance problem. The same fouling index in a poorly drained section is a structural problem. Restoring drainage often resolves ongoing pumping and progressive shear without requiring additional layer thickness.
  6. For freeze-thaw climates, treat frost blanket design as a geotechnical deliverable, not a construction detail. CPKC and CN Engineering Standards require PE-sealed frost blanket designs with supporting freeze index calculations. This is non-negotiable for projects in Canadian territory.
  7. Track modulus data is a valuable project diagnostic. Where the client has track geometry car data or rail deflection measurements, obtain and include this data in the investigation report. Low track modulus zones correlate strongly with subgrade problems and improve boring location selection.
Supplemental reference · LEVI Library

Geosynthetics and resilient layers in the trackbed

  • Long-term geogrid performance (CSXT, Port of Mobile, AL). In 1988 CSXT installed multi-layer punched-and-drawn polypropylene geogrid in the ballast and subballast of a 1,000-ft elevated curve that had needed resurfacing every six months or less. The resurfacing interval tripled. Samples exhumed in 2020 — after more than 2 billion gross tons and several floods, including Hurricane Katrina’s 12 ft of water — showed no loss of carbon black and a 45% increase in rib stiffness (Herbert and Gee, 2021).
  • Where geogrid is (and is not) worth it. The USACE WES literature review (Coleman, 1990) concluded that geogrid in ballast can reduce the rate of settlement and differential settlement, but warned against using it simply to reduce ballast thickness on low-density, low-speed track without site-specific justification. Place geogrid deep enough to stay below the tamping tines.
  • Sub-ballast mats. Resilient polyurethane mats placed under the ballast (for example on bridge decks or in tunnels) reduce structure-borne vibration and ballast breakdown on rigid bases. They are a structural/vibration measure and do not substitute for a drained subballast on soil subgrade.

Source: Herbert, D. and Gee, B. (2021). “Durability and Performance of Geogrid-Stabilized Ballast and Sub-ballast Track Section in Mobile, Alabama.” AREMA 2021 Annual Conference · Coleman, D. M. (1990). Use of Geogrids in Railroad Track: A Literature Review and Synopsis. U.S. Army Engineer Waterways Experiment Station, Misc. Paper GL-90 · Getzner Werkstoffe. Sub-Ballast Mats (product technical brochure)

Project management · ASCE (2012)

Resident Representative Duties and Acceptance of In Situ and Procured Materials

ASCE (2012) describes the owner’s resident project representative (RPR) as the person or firm that administers the construction contract on the owner’s behalf. RPR duties may include performing or directing QA, monitoring expenditures and progress payments, pushing timely review of submittals by the designer, evaluating and deciding on unforeseen conditions, coordinating owner site activities such as safety monitoring and testing, building the project record, and negotiating change orders.

The Manual divides materials into two classes. In situ materials are the native soil and rock; their suitability is established by laboratory testing and engineering evaluation, and the results and any retesting go into the project file. Procured materials include natural products such as earth fill and aggregates as well as manufactured items. For each procured material the file should record the qualification procedure and acceptance criteria, test type and date, the signature of the person testing, results, any nonconformance reports and, where specified, where in the structure the tested material was placed. Where workmanship is critical, the contractor may build a mock-up that, once accepted, becomes the standard for the remaining work. Substitutions are accepted only after the designer confirms they meet project objectives, and are then formalized by change order.

On unit-price contracts, common where quantities cannot be known precisely, the RPR and contractor jointly measure completed quantities. The Manual acknowledges that unknown soil conditions can change quantities enough that a unit price must be renegotiated, sometimes with a change in contract time. On lump-sum work the RPR checks that the schedule of values is not unbalanced.

For railroad work: Ballast, subballast, geosynthetics and select fill are procured materials and should be accepted against the railroad’s specification with traceable test records tied to stockpile, delivery ticket and placement station. Native subgrade exposed by undercutting is an in situ material whose acceptance (or further undercut) depends on the engineer’s evaluation at the time, which is a natural role for the RPR. A short test section at the start of a subgrade rehabilitation, accepted on proof rolling and density, can serve as the mock-up that sets the standard for the rest of the work.

Source: American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCE, pp. 169–175. Summarized and paraphrased. Full reference under Supplemental Sources.

Project management · Kelly et al. (2004)

Function Analysis and FAST Diagramming for Substructure Remedies

Function analysis is the core of value management. It describes what a project or element must do, as two-word verb–noun pairs, before anyone discusses what it should be. Kelly, Male and Graham have a team brainstorm functions, sort them from high-order needs down to low-order wants, and arrange them in a FAST (Function Analysis System Technique) diagram. Read left to right, the diagram answers “how?”; read right to left, it answers “why?”. A scope line separates the project’s mission from the functions open to brainstorming. In their technical FAST for a river crossing in a park, the mission “facilitate passage across river” leads to the primary function “support people,” with the parallel function “span river” and secondary functions such as “protect people” and “control people.” Design objectives such as “non-slip surface” and “reduce downtime due to flooding” sit above the diagram. Because the team works from functions, the solutions it considers range beyond bridge types: the authors note the answer might be a cable ferry rather than a bridge. For elements, element function analysis has five stages: pick the cost-dominant elements; list every function the element can perform; delete the functions not needed in this context; brainstorm against the functions that remain; and evaluate.

For railroad work: Apply element function analysis to the track substructure before choosing a remedy for a chronic soft spot. The candidate functions of ballast, subballast and subgrade include “distribute load,” “resist shear,” “drain water,” “separate layers,” “restrain track,” “limit frost penetration” and “provide resilience.” Keep only those the investigation shows are failing. If the evidence points to failed “drain water” and “separate layers,” that is, mud-pumping fines with a sound deeper subgrade, the brainstorm should center on drainage and filter or separation solutions, not a deep undercut. If “resist shear” is failing in the subgrade itself, the option set changes. Stating the needed functions explicitly ties the recommendation to the diagnosis and gives reviewers a clear reason why other remedies were set aside.

Technical FAST diagram for a river crossing, arranging verb–noun functions along how/why logic with primary, parallel and secondary objectives and design objectives above.
Figure 2-PM1. Technical FAST diagram for a river crossing, arranging verb–noun functions along how/why logic with primary, parallel and secondary objectives and design objectives above. Source: Kelly et al. (2004), Fig. 3.8.

Source: Kelly, J., Male, S. and Graham, D. (2004). Value Management of Construction Projects. Oxford: Blackwell Science, pp. 62–69, 75–77. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental Sources.

Project management · Jacob and Müller (2017)

Building an Earthwork Unit Price from Crew, Equipment and Haul Cycle

Passeck’s chapter in Jacob and Müller builds earthwork unit prices from the bottom up. The direct cost of each bid item is split into five parts: labor, equipment (including fuel and lubricants), materials, third-party services and transport, and site facilities. Percentage surcharges are then added. The example uses 8% general overhead, 6% site overhead, 3% risk and 3% profit, a total of 20%.

The cost components are built up as follows:

  • Labor. The all-in operator wage is the base wage plus premiums, ancillary costs, social costs and imputed costs. In the book’s example these add-ons total 140%, so the all-in rate is 2.4 times the base wage.
  • Equipment. The hourly rate is depreciation, interest and repair, from an equipment register at 170 hours per month, adjusted to market (60% in the example). Fuel and lubricants are added from rated power and specific consumption, plus the operator with a 10% maintenance allowance. For a 35-tonne (about 77,000 lb) excavator the components were about 48% ownership and repair, 24% fuel and 28% operator.
  • Equipment choice by haul distance. Dozer up to about 230 ft, loader up to about 490 ft, scraper up to about 820 ft. Beyond that, excavator, haul units and spreader/compactor work separately. Articulated dumpers suit rough haul roads up to about 1.5 mi, and trucks suit longer hauls on better roads.

Worked haul example (book values converted to US units):

  • Loader output is 327 BCY/hr.
  • Each truck carries 10.5 BCY (13.1 LCY at 25% swell).
  • The one-way haul is 16,400 ft at 13 mph, which is 70% of the 18.6 mph site limit.
  • The cycle is 3 min to load, 2 min to dump and 28.6 min to travel, 33.6 min in all, so each truck makes 1.79 loads/hr, or 18.7 BCY/hr.
  • 327 ÷ 18.7 = 17.5, so 18 trucks are needed.
  • Haul cost per BCY is (18 × truck rate) ÷ 327.

The excavate-haul-place-compact item then added loading (14%), haul (57%), spreading and compaction with one dozer and two rollers (25%), and fine grading (4%). Haul dominated the cost.

The authors stress pricing all earthwork items together, using a mass haul diagram to minimize haul distance and stockpiling, and adjusting manufacturer production figures for soil class, swell and site constraints.

For railroad work: Undercutting and subgrade rehabilitation estimates should be built the same way. The cycle is constrained by track-window length, the number of access points, and on-track or hi-rail haul instead of open haul roads. Haul units cannot cross or foul the live track without protection. Use productivity per effective window hour after setup, flagging and clearing time, not per shift hour. Show spoil disposal (especially fouled ballast) and imported subballast as separate cost lines.

Example mass haul diagram plotting cumulative cut and fill volume against station, used to balance earthwork and find average haul distances (SI units in the original).
Figure 2-PM2. Example mass haul diagram plotting cumulative cut and fill volume against station, used to balance earthwork and find average haul distances (SI units in the original). Source: Jacob and Müller (2017), Figure 2.7.

Source: Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & Sohn, pp. 36–50. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental Sources.

Project management · Pratt (2011)

Pricing Undercut, Haul and Imported Subballast: Crew Rates, Fixed Costs and Truck Fleet Size

Pratt prices excavation from productivity and crew cost, and keeps the two separate. Unit cost equals crew-hours per unit times cost per crew-hour. That way a change in wage rates and a change in productivity can each be applied on its own. Applied separately, an 8% wage increase and a 10% productivity loss raise the unit price by 18.8%, not the 18% you get by adding them.

Fixed costs depend heavily on job size. A backhoe that digs 60 CY/h, with $4,000 for transport and set-up, comes to $2.73/CY for equipment on a 3,000-CY job but $14.73/CY on a 300-CY job.

For hauling, Pratt sizes the truck fleet so that the excavator or loader never waits:

Number of trucks = (round-trip travel time + unloading time) / loading time + 1, always rounded up

Loading time is the truck’s bank-measure capacity divided by the loader output. Bank capacity is the loose capacity divided by (1 + swell). In his gravel example, the pit is 16 miles away, trucks average 20 mph and take 5 minutes to unload, so the cycle away from the loader is 101 minutes. A 12-CY truck with 12% swell carries 10.71 bank CY. At 50 BCY/h the loader fills it in 12.85 minutes, so the fleet is 101/12.85 + 1 = 8.86, rounded up to 9 trucks. With a $2.50/CY pit royalty, the delivered gravel costs $16.34 per bank CY. A price quoted per ton is converted using the weight of a compacted cubic yard: $/CY = $/ton × (lb/CY) / 2,000.

Table 2-PM2. Table: Loose and bank weights and compaction factors (after Pratt 2011, Figure 10.2)

MaterialLoose (lb/CY)Bank (lb/CY)Compaction factor
Clay, dry2,5003,10024.0%
Gravel, pit-run, dry2,5502,85011.8%
Sand, dry2,4002,70012.5%
Sand and gravel, dry2,9003,25012.1%

For railroad work: on undercutting and subgrade rehabilitation, the track window usually sets the production rate, not the excavator. Estimate the cubic yards that can be removed and replaced per window. Then size the spoil trucks, side-dump cars or ballast cars with Pratt’s formula, so the machine never waits during a window that has already been paid for. On short jobs, fixed costs (mobilization, work-train set-up, flagging) are spread over a small quantity and dominate the unit price, as Pratt’s 300-CY case shows. Price imported subballast in bank measure, with explicit compaction and waste allowances.

Source: Pratt, D. J. (2011). Fundamentals of Construction Estimating, 3rd ed. Clifton Park, NY: Delmar Cengage Learning, pp. 224–235. Summarized and paraphrased. Full reference under Supplemental Sources.

2.15 Design Checklist

Checklist · Part III · Track Substructure

Design Checklist

Investigation Phase0 of 10
Analysis and Design Phase0 of 8
Deliverable Phase0 of 7
Ticks are saved in this browser.
Plain text version

Investigation Phase

  • [ ] Confirm design train loading (Cooper E-80, GRL, DLF) with client project engineer
  • [ ] Obtain existing as-built track structure details (ballast depth, tie type, subballast)
  • [ ] Request GPR survey data (available from client or commission new survey)
  • [ ] Plan borings at GPR anomaly stations and at representative clean locations
  • [ ] Collect ballast samples for gradation and fouling index (sample at tie base level)
  • [ ] Perform field vane shear tests or collect undisturbed subgrade samples for s_u
  • [ ] Perform CBR tests on subgrade (field or lab per ASTM D1883)
  • [ ] Measure groundwater depth; install piezometers at soft subgrade stations
  • [ ] Assess frost susceptibility of subgrade (USACE FS classification; Chapter 8)
  • [ ] Obtain historical geometry car data from client (geometry deviation trends)

Analysis and Design Phase

  • [ ] Calculate σ_s for existing and proposed track section at each boring location
  • [ ] Compute FS_shear at each station; flag stations with FS < 3.0
  • [ ] Compute Fouling Index at each ballast sample location
  • [ ] Design subballast filter (Terzaghi criteria, AREMA Ch. 1)
  • [ ] Design blanket layer thickness (for CBR < 5 or frost-susceptible subgrade)
  • [ ] Compute frost penetration depth (Modified Berggren) for CPKC and CN projects
  • [ ] Design edge drain system (pipe size, outlet spacing, geotextile filter)
  • [ ] Check track modulus adequacy (u ≥ client minimum)

Deliverable Phase

  • [ ] Produce along-alignment subgrade characterization table (USCS, s_u, CBR, FI, σ_s, FS)
  • [ ] Flag high-priority rehabilitation stations clearly on plan and profile
  • [ ] Include ballast sampling data table with FI values and classification
  • [ ] Include GPR interpretation map (color-coded fouling zones referenced to station)
  • [ ] Include proposed track section diagram with layer thicknesses and materials
  • [ ] Include GSP language for blanket layer construction, compaction, and testing
  • [ ] PE seal calculations (required by CSXT, NSR, UPRR, BNSF, CPKC, Amtrak, CN)
2.16 Cross-Reference Table
TopicSee Also
CBR and subgrade M_r testingChapter 18
Frost blanket design (Modified Berggren)Chapter 18, Section 18.6
Ground improvement for soft subgradeChapter 17
Undrained shear strength from VST/CPTChapter 7
Consolidation settlement of subgradeChapter 12
Bearing capacity of subgrade layerChapter 11
Geotechnical Special Provisions (subgrade)Appendix C
Lab testing for subgrade soilsChapter 10
2.17 Practice Questions

Q1. A concrete tie track carries Cooper E-80 loading with DLF = 1.3. Ballast depth is 14 in. (1.167 ft) and subballast is 8 in. (0.667 ft), giving d = 1.833 ft. Tie width B_t = 11 in. (0.917 ft), L_t = 8.5 ft. Calculate: (a) dynamic wheel load P_d, (b) effective area A_eff at top of subgrade (θ = 35°), and (c) vertical stress σ_s.

Answer:

  • (a) P_d = 40,000 × 1.3 = 52,000 lb
  • (b) A_eff = (0.917 + 2 × 1.833 × 0.700) × (8.5 + 2 × 1.833 × 0.700) = (0.917 + 2.566) × (8.5 + 2.566) = 3.483 × 11.066 = 38.55 ft²
  • (c) σ_s = 52,000 / 38.55 = 1,349 psf = 0.67 tsf

Q2. A subgrade soil has s_u = 500 psf (from VST). The static wheel load is 40,000 lb and A_eff = 42.0 ft². (a) Calculate σ_s(static). (b) Calculate allowable stress for cyclic loading (FS = 3.0). (c) Is the subgrade adequate? (d) What total layer thickness d would reduce σ_s(static) to σ_allow?

Answer:

  • (a) σ_s(static) = 40,000 / 42.0 = 952 psf
  • (b) σ_allow = (π + 2) × 500 / 3.0 = 5.14 × 500 / 3.0 = 857 psf
  • (c) σ_s(static) = 952 > 857 psf → Not adequate
  • (d) Need A_eff ≥ 40,000 / 857 = 46.7 ft²; (0.917 + 1.4d)(8.5 + 1.4d) ≥ 46.7 → solve: d ≈ 2.25 ft = 27 in. → use 30 in. minimum (round up per AREMA practice)

Q3. A ballast sample has 17.5% passing No. 4 sieve and 4.2% passing No. 200 sieve. (a) Calculate Fouling Index. (b) What is the fouling classification? (c) What action is recommended by BNSF Engineering Instructions?

Answer:

  • (a) FI = 17.5 + 4.2 = 21.7
  • (b) Fouled (FI 20–40)
  • (c) BNSF Engineering Instructions require immediate ballast cleaning for FI > 20; schedule ballast undercutter-cleaner. Investigate subgrade condition with borings if track geometry defects are present.

Q4. A rail section uses 136 RE rail (I = 95.0 in.⁴, E = 30 × 10⁶ psi) and has a track modulus u = 2,500 psi. (a) Calculate the characteristic length l. (b) Calculate the maximum rail bending moment under P_w = 40,000 lb.

Answer:

  • (a) l = (4 × 30×10⁶ × 95.0 / 2,500)^(1/4) = (11.4 × 10⁹ / 2,500)^(1/4) = (4.56 × 10⁶)^(1/4) = (4.56 × 10⁶)^0.25 = 46.3 in.
  • (b) M_max = P_w × l / 4 = 40,000 × 46.3 / 4 = 463,000 in.·lb = 38,583 ft·lb

Q5. A GPR survey identifies a reflector at t_twtt = 8.5 ns in ballast with estimated ε_r = 6.5. (a) Calculate the wave velocity in this ballast. (b) Calculate the depth to the reflector. (c) If the expected ballast/subballast interface is at 24 in. (2.0 ft), is the measured depth consistent with a clean or fouled ballast layer?

Answer:

  • (a) v = 0.984 / √6.5 = 0.984 / 2.550 = 0.386 ft/ns
  • (b) d_GPR = (0.386 × 8.5) / 2 = 3.281 / 2 = 1.64 ft = 19.7 in.
  • (c) Measured depth is 19.7 in. vs. expected 24 in. The dielectric constant ε_r = 6.5 falls in the clean to slightly fouled range (Table 2-6: 5–6 for clean, 8–12 for moderately fouled). The reflector at 19.7 in. suggests less ballast than designed — either compaction settlement of ballast or a thin section. Recommend correlation boring at this station to confirm actual layer thicknesses.
2.18 Case Studies

Field case studies by Burt G. Look, from Earthworks: Theory to Practice – Design and Construction (CRC Press/Balkema, 2023), chosen for this chapter’s topics. Each is summarized from the book with its key figures and a closing note on railroad application added by the authors of this manual. Credit for the case material belongs to Look; see item S13 under Supplemental Sources.

Case Study 2.18.1 — Zoning the best subgrade material, and losing it in the stockpile
Case study · Look (2023) §14.15

Related section: 2.4 Subballast Requirements and Blanket Layer Design

In a 2008 rail project, residual soils in Cut No. 5 (about 40,500 yd³) had their highest CBR in the middle of the cutting, not at depth. Strength does not necessarily increase with depth. Using the CBR 10 material at subgrade level would have reduced layer thickness and the imported capping layer, here the subballast, so it was stockpiled for reuse.

Checks on the stockpile found inconsistent CBR, and inspection showed it had been mixed with poorer material, visible as a change in colour. Look’s shorthand for the result: CBR 10 + CBR ≤ 5 ≠ CBR 7; the mix behaves more like CBR 5.

For railroad work: selective excavation and zoning can cut subballast quantities, but only with stockpile control: separate, marked piles, a haul plan, and verification testing of the stockpile before it is placed. Without that, design the subballast for the poorer material.

Spatial variation of CBR in Cut 5 (yield about 40,500 yd³): the best material lies in the middle zone.
Figure 2-LK1. Spatial variation of CBR in Cut 5 (yield about 40,500 yd³): the best material lies in the middle zone. Source: Look (2023), Figure 14.16-1, p. 555.
Stockpile checks: consistent CBR 10 material (top) and inadvertent mixing visible as colour change (bottom).
Figure 2-LK2. Stockpile checks: consistent CBR 10 material (top) and inadvertent mixing visible as colour change (bottom). Source: Look (2023), Figure 14.16-2, p. 555.

Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §14.15, pp. 552–554. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental Sources.

Case Study 2.18.2 — Rail formation on broken hard rock: ruts after a week, tests all passed
Case study · Look (2023) §14.13

Related section: 2.8 Subgrade Drainage Design

On a 3.7 mi rail alignment around 2008, a short cutting (under 490 ft) hit very high-strength volcanic rock near the surface. With small volumes and no other large cuts, the contractor used a rock breaker, and the work took more than six months. The broken rock surface was uneven and out of tolerance for the required vertical grade. High-quality fill was compacted into the voids to even it out before the capping layer was placed.

Rain followed soon after. No ponding showed at the surface, but water collected in the hollows of the impermeable rock below and could not drain. About a week after completion, construction traffic rutted the formation, although the density and plate load tests had passed. With water trapped in these “bowls”, Skempton’s B is about 1, so each truck pass generated high excess pore pressure. Look’s lessons:

  • Passing strength and density tests do not guarantee against failure, and the failure was not due to material quality.
  • Water must not pond, including where ponding is hidden in an uneven rock surface below the fill.
  • Drainage is needed but hard to achieve everywhere when a rock breaker cannot produce a level surface.
  • Here, a low-strength concrete backfill to give an even, impermeable surface is the better detail.

For railroad work: the same trapped-water mechanism produces mud pumping and track geometry defects where subballast sits on an irregular rock or old hard-pan surface. Shape the rock formation to drain, or level it with lean concrete, before placing subballast.

Ruts formed about one week after completion, under construction traffic.
Figure 2-LK3. Ruts formed about one week after completion, under construction traffic. Source: Look (2023), Figure 14.13-2, p. 551.

Source: Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case study §14.13, pp. 548–550. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental Sources.

Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Primary sources

  • Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management
  • Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics
  • AREMA Manual for Railway Engineering (MRE), Chapter 1 — Roadway and Ballast
  • ASTM C29, C88, C127, C535, D1883, D4694 (ballast, subballast and subgrade tests)

Supplemental sources (LEVI Library)

  • Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis
  • Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0)
  • McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of Kentucky
  • Herbert, D. and Gee, B. (2021). “Durability and Performance of Geogrid-Stabilized Ballast and Sub-ballast Track Section in Mobile, Alabama.” AREMA 2021 Annual Conference
  • Leng, Z. and Al-Qadi, I. L. “Railroad Ballast Evaluation Using Ground-Penetrating Radar: Laboratory Investigation and Field Validation.” Transportation Research Record
  • Coleman, D. M. (1990). Use of Geogrids in Railroad Track: A Literature Review and Synopsis. U.S. Army Engineer Waterways Experiment Station, Misc. Paper GL-90
  • Getzner Werkstoffe. Sub-Ballast Mats (product technical brochure)
  • Martland, C. D. (2013). “Introduction of Heavy Axle Loads by the North American Rail Industry.” Journal of the Transportation Research Forum 52(2): 103–125
  • Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §14.13, §14.15

File locations for these documents are listed under Supplemental Sources — LEVI Library.

Project management sources

  • Seeley, I. H. (1993). Civil Engineering Quantities, 5th ed. Basingstoke: The Macmillan Press
  • American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCE
  • Kelly, J., Male, S. and Graham, D. (2004). Value Management of Construction Projects. Oxford: Blackwell Science
  • Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & Sohn
  • Pratt, D. J. (2011). Fundamentals of Construction Estimating, 3rd ed. Clifton Park, NY: Delmar Cengage Learning
Supplemental Sources — LEVI Library

Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After UFC 4-860-01FA (2004)” draw on item S11 and are rewritten for railroad clients. Blocks marked “After Selig & Waters (1994)” summarize item S12 for railroad clients; tables are condensed from the book and its figures are not reproduced. The Case Studies section summarizes case studies from item S13 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.

  1. Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis
  2. Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0)
  3. McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of Kentucky
  4. Herbert, D. and Gee, B. (2021). “Durability and Performance of Geogrid-Stabilized Ballast and Sub-ballast Track Section in Mobile, Alabama.” AREMA 2021 Annual Conference
  5. Leng, Z. and Al-Qadi, I. L. “Railroad Ballast Evaluation Using Ground-Penetrating Radar: Laboratory Investigation and Field Validation.” Transportation Research Record
  6. Coleman, D. M. (1990). Use of Geogrids in Railroad Track: A Literature Review and Synopsis. U.S. Army Engineer Waterways Experiment Station, Misc. Paper GL-90
  7. Getzner Werkstoffe. Sub-Ballast Mats (product technical brochure)
  8. Martland, C. D. (2013). “Introduction of Heavy Axle Loads by the North American Rail Industry.” Journal of the Transportation Research Forum 52(2): 103–125
  9. Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)
  10. Benesch. Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. Colwell
  11. U.S. Army Corps of Engineers, Naval Facilities Engineering Command and Air Force Civil Engineer Support Agency (2004). UFC 4-860-01FA, Railroad Design and Rehabilitation. Unified Facilities Criteria, 16 January 2004 (supersedes TI 850-02, 1 March 2000); approved for public release, distribution unlimited. Used on this page: ch. 2 (§4), ch. 6 (§§5, 8)
  12. Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 1–3, 5–10, 12, 13 and 16
  13. Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. Leiden: CRC Press/Balkema (Taylor & Francis). ISBN 978-1-032-10470-6. Case studies used on this page: §14.13, §14.15
  14. Seeley, I. H. (1993). Civil Engineering Quantities, 5th ed. Basingstoke: The Macmillan Press. Used on this page for project-management material
  15. American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCE. Used on this page for project-management material
  16. Kelly, J., Male, S. and Graham, D. (2004). Value Management of Construction Projects. Oxford: Blackwell Science. Used on this page for project-management material
  17. Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & Sohn. Used on this page for project-management material
  18. Pratt, D. J. (2011). Fundamentals of Construction Estimating, 3rd ed. Clifton Park, NY: Delmar Cengage Learning. Used on this page for project-management material
← Previous · Part II Chapter 1 — Introduction to Railway Ground Hazard Risk Management
Next · Part III → Chapter 3 — Track Foundation Elements